5-37
Valco Cincinnati, Inc.
Section 5 – Setup
MM125 - D-90 Hot Melt Unit
Configuration
The Configuration Menu contains screens that allow the user to setup global
parameters for the hot melt control. These configurations are shown below.
The number of hoses is used to set the control for how many hose/gun pairs
are being used by the operator. This setting would be set at the factory before
shipment.
Number of Hose
Outlets
An Auxiliary I/O board (151XX661) can be ordered separately as an option to
allow the operator to use four more user inputs and outputs. Once the board
is installed, the Auxiliary I/O must be enabled. The factory default setting is
“Disabled”. See Section 4 – Installation for Auxiliary I/O board connector. This
parameter can be accessed in Password Level 2 or higher (see Appendix A
Password Level).
When the Auxiliary I/O is set to “Enabled”, the additional programmable
inputs and outputs (5-8) will be activated.
When the Auxiliary I/O is set to “Disabled”, the additional programmable
inputs and outputs (5-8) will be deactivated.
Auxiliary I/O
Содержание D-90
Страница 20: ...3 2 ValcoMelton Section 3 Basic Features MM125 D 90 Hot Melt Unit Figure 3 2 Basic Features Overview Continued ...
Страница 22: ...3 4 ValcoMelton Section 3 Basic Features MM125 D 90 Hot Melt Unit Manifold Figure 3 3 Manifold ...
Страница 29: ...4 5 ValcoMelton Section 4 Installation MM125 D 90 Hot Melt Unit Electrical Panel ...
Страница 49: ...5 10 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Set Language Continued ...
Страница 50: ...5 11 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Set Temperature Units ...
Страница 52: ...5 13 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Grid Temperature Hose Valve Temperature ...
Страница 53: ...5 14 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Hose Valve Temperature Continued ...
Страница 56: ...5 17 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Ready Delay Time Continued ...
Страница 61: ...5 22 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Beacon 2 Beacon Alarm Setup Continued ...
Страница 67: ...5 28 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Moving Through the Shift Time Day Screens ...
Страница 73: ...5 34 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Sequential Start Valve ...
Страница 109: ...10 3 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit Overall Assembly Continued 776XX883 01 dwg ...
Страница 112: ...10 6 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit Sheet Metal Assembly 776XX883 03 ...
Страница 113: ...10 7 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit 776XX883 03 Sheet Metal Assembly Continued ...
Страница 114: ...10 8 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit 776XX883 03 Sheet Metal Assembly Continued ...
Страница 125: ...10 19 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit D 90 HMU Electrical Panel Assembly 776XX281 ...
Страница 129: ...10 23 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit D90 Hot Melt Unit EQM0690 EQM0690 01 dwg ...
Страница 136: ...10 30 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit Electrical Panel Assembly EQM0694 dwg ...
Страница 142: ...A 2 ValcoMelton Appendix A Password Levels MM125 D 90 Hot Melt Unit Setting Level 0 as Default Continued ...
Страница 146: ...C 2 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit 240V 3Ø 029XX435 ...
Страница 147: ...C 3 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit 240V 3Ø 029XX435 ...
Страница 148: ...C 4 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...
Страница 149: ...C 5 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...
Страница 150: ...C 6 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...