B-2
ValcoMelton
Appendix B - Power Requirements
MM125 - D-90 Hot Melt Unit
System Power Requirement
Calculation - D-90 Units -
Continued
6.
Add the power requirements of hose #6 and gun #6. Compare
this value to the maximum wattage given in Line 6 of Table 1.
7.
Add the power requirements of all hoses and all guns. Compare
this value to the maximum wattage for all hoses and guns given
in Line 7 of Table 1.
8.
If any of the power requirements calculated in steps 1-7 exceed
any of the maximum allowable wattages given in Table 1, the
hose length or gun configuration must be changed, to reduce all
power requirements to below maximum-allowable wattages.
If each of the power requirements calculated in steps 1-7 is
below the maximum allowable wattages given in Table 1, the
system power requirement is within allowable limits.
Содержание D-90
Страница 20: ...3 2 ValcoMelton Section 3 Basic Features MM125 D 90 Hot Melt Unit Figure 3 2 Basic Features Overview Continued ...
Страница 22: ...3 4 ValcoMelton Section 3 Basic Features MM125 D 90 Hot Melt Unit Manifold Figure 3 3 Manifold ...
Страница 29: ...4 5 ValcoMelton Section 4 Installation MM125 D 90 Hot Melt Unit Electrical Panel ...
Страница 49: ...5 10 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Set Language Continued ...
Страница 50: ...5 11 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Set Temperature Units ...
Страница 52: ...5 13 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Grid Temperature Hose Valve Temperature ...
Страница 53: ...5 14 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Hose Valve Temperature Continued ...
Страница 56: ...5 17 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Ready Delay Time Continued ...
Страница 61: ...5 22 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Beacon 2 Beacon Alarm Setup Continued ...
Страница 67: ...5 28 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Moving Through the Shift Time Day Screens ...
Страница 73: ...5 34 Valco Cincinnati Inc Section 5 Setup MM125 D 90 Hot Melt Unit Sequential Start Valve ...
Страница 109: ...10 3 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit Overall Assembly Continued 776XX883 01 dwg ...
Страница 112: ...10 6 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit Sheet Metal Assembly 776XX883 03 ...
Страница 113: ...10 7 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit 776XX883 03 Sheet Metal Assembly Continued ...
Страница 114: ...10 8 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit 776XX883 03 Sheet Metal Assembly Continued ...
Страница 125: ...10 19 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit D 90 HMU Electrical Panel Assembly 776XX281 ...
Страница 129: ...10 23 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit D90 Hot Melt Unit EQM0690 EQM0690 01 dwg ...
Страница 136: ...10 30 Section 10 Part Number List ValcoMelton MM125 D 90 Hot Melt Unit Electrical Panel Assembly EQM0694 dwg ...
Страница 142: ...A 2 ValcoMelton Appendix A Password Levels MM125 D 90 Hot Melt Unit Setting Level 0 as Default Continued ...
Страница 146: ...C 2 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit 240V 3Ø 029XX435 ...
Страница 147: ...C 3 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit 240V 3Ø 029XX435 ...
Страница 148: ...C 4 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...
Страница 149: ...C 5 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...
Страница 150: ...C 6 ValcoMelton Appendix C Schematics MM125 D 90 Hot Melt Unit ...