background image

For the heating engineer

Installation manual

GB

auroTHERM

Multi-row in-roof mounting

VFK 145/2 H/V

VFK 155 H/V

Содержание auroTHERM VFK 145/2 H

Страница 1: ...For the heating engineer Installation manual GB auroTHERM Multi row in roof mounting VFK 145 2 H V VFK 155 H V...

Страница 2: ...n 7 4 Interconnection scheme 8 5 Assembly 11 5 1 Required tools 11 5 2 Preparing the roof duct 12 5 3 Installation kits 12 5 4 Installation dimensions 17 5 5 Installation 18 5 5 1 Preparing the roof 1...

Страница 3: ...plicability of the manual These installation manual applies exclusively to flat col lectors with the following article numbers Collector type Article number auroTHERM VFK 145 2 H 0010004457 0010008899...

Страница 4: ...n supervision or instruction con cerning use of the unit by a person responsible for their safety Children must be supervised to ensure they do not play with the unit Vaillant auroTHERM flat collector...

Страница 5: ...Before installation check the maximum roof load Mount the flat collectors only on roofs with a sufficient load carrying capacity If necessary call a technician b Caution Leaks With roof pitches 22 rai...

Страница 6: ...ill the solar system only with Vaillant ready mixed solar fluid 3 3 Technical Guidance The system must be installed in accordance with all rele vant and applicable national regulations and must be ins...

Страница 7: ...particular height Provide the mandatory fall protection by using e g roof restraining frameworks or roof protection walls If a roof restraining framework or a roof protection wall is not appropriate u...

Страница 8: ...wever the direction of flow is always from bottom to top 1 4 5 Fig 4 2 Series connection of 1 5 flat connectors If you connect 1 to 5 collectors one after another the hydraulic connections can be laid...

Страница 9: ...ries as possible but never more than 12 Only connect collector rows with the same aperture area in parallel to prevent differ ing pressure losses in the partial collector arrays Make sure that each pa...

Страница 10: ...ing to the following instructions b Caution Danger of material damage as a result of incorrect fitting If the stop valve is closed or incor rectly installed the flat collector can be damaged by overpr...

Страница 11: ...ollectors b Caution Danger of damaging internal components The interior of the collector is vented by the opening integrated in the pipe penetration Keep the vent opening clear for trouble free operat...

Страница 12: ...a v shaped cut in the roofing felt Fold the upper wider flap on to the roof batten above and the lower narrower flap on to the roof batten below Fix the roofing felt tight to the roof batten This ens...

Страница 13: ...5 6 10 15 34 33 28 27 24 25 31 29 32 18 12 35 13 26 17 22 19 30 16 20 21 23 11 14 13 Fig 5 3 Installation kit for vertical collector VFK 145 2 155 V 13 Installation manual auroTHERM 0020100606_02 Ass...

Страница 14: ...on 35 Right hand front section Table 5 1 Kit for vertical collector VFK 145 2 155 V Collector array packaging You require one hydraulic installation set for each collec tor row and one hydraulic expan...

Страница 15: ...7 15 31 33 13 32 26 20 21 23 11 16 22 35 18 17 10 28 29 12 13 14 30 34 24 27 25 36 19 Fig 5 5 Installation kit for horizontal collector VFK 145 2 155 H 15 Installation manual auroTHERM 0020100606_02...

Страница 16: ...d cap 33 Left hand front section 34 Centre front section 35 Right hand front section 36 Horizontal intermediate plate only for single row Table 5 3 Kit for horizontal collector VFK 145 2 155 H Collect...

Страница 17: ...border Number of collectors 1 2 3 4 5 6 7 8 9 10 11 12 Vertical collector position Height of collector array A 4720 6830 8940 11050 13160 15260 17370 19480 21590 23700 25800 Width of collector array...

Страница 18: ...rientation VFK H or a vertical orien tation VFK V They are arranged on top of one another and next to one another in a collector array 2 to 12 collectors next to one another 2 or more collectors on to...

Страница 19: ...roof batten are resting centrally on a rafter Screw the roof batten firmly to each rafter using one of the supplied No 3 screws Table 5 2 5 4 in each case 5 5 2 Laying out the collectors Before start...

Страница 20: ...s resting horizontally on the roof batten 5 5 3 1 Left hand front section 1 Fig 5 10 Attaching the left hand front section at the bottom Pick up the left hand front section Table 5 1 5 3 Item 33 Fit t...

Страница 21: ...ertical collector row Table 5 1 5 3 Item 34 For all VFK 145 2 155 V 1 centre front section is required For all VFK 145 2 155 H 2 centre front sections are required Complete the row of front sections w...

Страница 22: ...sheet into the fold on the right hand sheet 2 and 3 Align the right hand sheet to the mark on the left hand sheet 4 Now remove the entire upper protective film from the adhesive surface on the left h...

Страница 23: ...31 and No 2 screws Table 5 2 5 4 on each side using the Torx bit The folded side 1 of the clamp must point away from the collector Take care that the chamfered side 2 of the clamp grips the edge of th...

Страница 24: ...inaccurate mounting position Leaks can occur in the cover plates for roof integration if the mounting position of the spacer is not precise Take care that the spacer is lying horizontally is resting...

Страница 25: ...ush at the side on the inner edge of the collector terminates at the ends in line with the inner edge of the collector Using a spirit level make sure that the collectors line up above one another that...

Страница 26: ...l lector can fall off and endanger persons After fixing each collector check that all screwed connec tions are tight and retighten them if necessary 1 2 3 4 Fig 5 20 Hydraulic connections for the VFK...

Страница 27: ...tions are tight and retighten them if necessary 5 5 5 Fitting the remaining vertical collector rows Before assembling the next vertical row lay down the collectors as described in Chapter 5 6 2 Fit t...

Страница 28: ...Table 5 2 5 4 cf Fig 5 12 b Caution Danger of damage to the collectors The flat collector can be damaged if the pipe coupler is not fitted cor rectly Make sure that the clip A slides into the slot in...

Страница 29: ...the uppermost row of the collector array Insert the collector sensor into the open ing Use a cable tie to prevent the collector sensor from slipping out 1 2 3 4 Fig 5 24 Fitting the hydraulic connect...

Страница 30: ...ertical intermediate plates when more than 2 collectors are laid next to one another Further horizontal intermediate plates when more than 2 collectors are laid on top of one another In the last row a...

Страница 31: ...f collectors on top of one another Item number of the plate from Table 5 1 Table 5 3 2 1 x No 19 1 x No 20 Number of collectors next to one another Item number of the plate from Table 5 1 Table 5 3 3...

Страница 32: ...side sections to the roof bat tens with the supplied brackets 2 Table 5 1 5 3 Item 31 and No 2 screws Table 5 2 5 4 using the Torx bit 5 5 7 Attaching trapezoidal plates connectors ridge sheets and t...

Страница 33: ...s that the roof battens are resting flush against the outer edge of the collector that the roof battens terminate in the middle of a rafter and abut with the next batten 1 max 150 4 3 2 Fig 5 31 Fitti...

Страница 34: ...from the ridge plates Table 5 1 5 3 Item 14 15 10 Slide the ridge plates 1 over the lower ridge plate couplings Make sure that the ridge plates are above the side sections and slip into the corre spo...

Страница 35: ...ering the profile ends with tile supports Lay the tile supports Table 5 1 5 3 Item 12 on the ridge plates Bend the metal bands and hook the tile bars to the roof batten above Fig 5 37 Fitting the end...

Страница 36: ...the sealing apron extension under the flexible apron Pay attention to the direction the rain water flows in when doing this 5 C 40 C Fig 5 39 Sticking the flexible protection Turn the flexible aprons...

Страница 37: ...moved tiles and adapt them if necessary 5 6 Checklist Based on the following table make sure all work steps have been performed Step 1 All connections fixed with safety clips 2 Hydraulic connections l...

Страница 38: ...ing a long period out of service the solar fluid can age prematurely as a result of the ingress of atmospheric oxygen Make sure that only a competent person takes the solar energy system out of serv i...

Страница 39: ...nd Vaillant Service 8 1 Guarantee Vaillant provides a full parts and labour guarantee for this appliance The appliance and all associated pipe work and controls must be installed by suitably compe ten...

Страница 40: ...a m2 2 33 Absorber mm Aluminium vacuum coated 0 4 x 1178 x 1978 Aluminium vacuum coated 0 5 x 1178 x 1978 Coating High selective blue 95 5 Glass thickness mm 3 2 Glass type Solar safety glass prismati...

Страница 41: ...41 Installation manual auroTHERM 0020100606_02 VFK 145 2 V VFK 155 V 80 2033 1233 1978 1223 5 80 1178 79 79 1875 Fig 9 1 Dimensional drawing VFK 145 2 V VFK 155 V Technical data 9...

Страница 42: ...Installation manual auroTHERM 0020100606_02 42 VFK 145 2 H VFK 155 H 80 2033 1178 1233 1978 66 5 66 5 1100 1223 5 Fig 9 2 Dimensional drawing VFK 145 2 H VFK 155 H 9 Technical data...

Страница 43: ......

Страница 44: ...21 91 18 0 Telefax 021 91 18 28 10 info vaillant de www vaillant de Vaillant Ltd Nottingham Road Belper Derbyshire DE56 1JT Telephone 0330 100 3461 Vaillant Service Solutions 0330 100 3461 Spares Tech...

Отзывы: