![V-TEK Versacount II+ Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/v-tek/versacount-ii/versacount-ii_user-manual_3083341016.webp)
6
Versacount II+ User’s Guide
Preparing the Work Area
61673621.fm
When loading, unloading or running the Versacount II+ , the operator should stand in front of the
machine controller to assure easy access to all controls and the
Power/Emergency Stop
button
which is located on the right side of the machine. This position also allows the operator to view all
parts of the Versacount II+ while it is in operation.
Allow at least 24” clearance at the front and sides of the machine for easy access and operation.
(Pictured in the overhead view below.)
The Versacount II+ will also require access to a 120/230 VAC, 50-60 Hz power supply. Locate
the machine so electrical power cables can be routed away from areas where personnel are
expected to move. It is recommended that cables be routed overhead or underground. If cables
must be routed over the floor, cover them with rubber ramps.
Allow 24 inches clearance on front and sides.
Содержание Versacount II+
Страница 2: ......
Страница 4: ......
Страница 10: ......
Страница 41: ...Maintenance Instructions Contents Safe Maintenance Steps 32 Safe Maintenance Steps 32 Calibration 33...
Страница 44: ...34 Versacount II User s Guide Calibration 61683512 fm...
Страница 46: ......
Страница 70: ...Service and Parts Contacts 61053915 fm Page 2...
Страница 72: ......
Страница 74: ......
Страница 75: ......
Страница 76: ...751 Summit Avenue Mankato MN 56001 507 387 2039 FAX 507 387 2257 www vtekusa com Email info vtekusa com...