![USAutomatic Ranger HD Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/usautomatic/ranger-hd/ranger-hd_installation-and-owners-manual_1064000013.webp)
11
1
Mounting Site Review
Review the following items prior to installation and predetermine the solution to any
problems which may exist:
1. Does sufficient space exist for mounting and future servicing of the operator and control box?
2. Which direction will the gate swing?
a. Will the gate operator pull the gate open to the inside (Pull to Open)?
b. Will the gate operator push the gate open to the outside (Push to Open)?
(See Determine Opening Method Section)
3. Where and how will the actuator mounting brackets be secured to the hinge post and
to the gate? (See Determine Actuator Mounting Brackets Sections)
4. How will the gate bracket be secured to the gate and will additional reinforcement be required?
(See Mount Support Bracket Section)
5. Where will the control box be mounted to support the weight of the battery and other
components and can it be located within 8 feet to prevent splicing of the linear actuator cable?
(See Install Ranger Control Box Section)
6. For AC Charged System - How far away is the 120 VAC receptacle for the transformer?
Transformer is supplied with 10 feet of cable. If extension is needed use power source cable
Extension Kit part #630038. See Power Source Cable Extension chart for identifying the wire
size needed for the distance required. Transformer must be installed indoors or in a raintight
enclosure. Transformer should not be exposed to moisture.
7. For Solar Charged System - Where will the solar panel mount so that optimum sunlight is
received? Solar panel is provided with 15 feet of cable, If extension is needed use power source
cable Extension Kit part #630038 or 75’ Solar Extension part #520016. See Power Source
Cable Extension chart for identifying the wire size needed for the distance required. Solar panel
typically needs to be facing a South or Southwest direction.
8. How will accessory control wiring, if any, be brought to the control box? Knock outs are provided
in control box bottom for conduit.
9. Have all safety concerns been addressed? Study the Safety Section and Entrapment Zones for
more information.
10. Identify entrapment areas. Determine the appropriate UL325 compliant monitored entrapment
device/devices that will be used to protect all entrapment areas.
11. Is there enough space beneath the linear actuator for the cable so that damage to the cable
does not occur? Actuator must not be installed with cable on the top side of the actuator. Cable
must exit actuator on the bottom side to prevent water from entering housing. (See Horizontal
Mounting Location Section)