background image

28  l  Uponor Combi Port BASE XU  l  Installation manual

Troubleshooting

Fault description

Cause

Solution

Hot water function

Hot water temperature too low  
or volatile

Central heating

%XႇHUWHPSHUDWXUHWRRORZ

%XႇHUWHPSHUDWXUHPXVWEH.DERYHKRWZDWHU

setpoint.

Heating circuit pump type not supported

The following pump type is supported:  
- Wilo Yonos Para

Setting for heating circuit pump is not correct

Heating circuit pump setting: Constant pressure

Pump performance too low

Check pump performance

Mixing valve faulty

Check mixing valve function

Setting for heating circuit control is not correct

Check heating circuit control setting

Heating circuit control faulty

Check heating control function

$LUWUDSSHGLQEXႇHUVWRUDJH

9HQWEXႇHUVWRUDJHWDQN

Cold water pressure too low/too high

Cold water pressure at unit: min. 2 bar, max. 4 bar

Combination heat interface unit

6WUDLQHULQSULPDU\ÀRZGLUW\

&OHDQWKHVWUDLQHULQWKHSULPDU\ÀRZ

Strainer in cold water input dirty

Clean the strainer in the cold water input

,QVXႈFLHQWGLႇHUHQWLDOSUHVVXUH

&OHDQWKHFDSLOODU\RIWKHGLႇHUHQWLDOSUHVVXUH
FRQWUROFKHFNWKHGLႇHUHQWLDOSUHVVXUHFRQWURO

is working

Air in the system

Vent the system while dispensing

,QVXႈFLHQWKHDWLQJYROXPHÀRZSDVVHVWKURXJK

the heat exchanger

&KHFNWKHYROXPHÀRZGXULQJPD[LPXPGLVSHQVLQJ

using heat meters:
Combi Port BASE XU: 15 l/min
Combi Port BASE XU: 21 l/min

Heat meter type not supported

Use heat meter type with Qn 1.5, ultrasound

,QVXႈFLHQWKHDWLQJYROXPHÀRZ

,QFUHDVHGLႇHUHQWLDOSUHVVXUH

Heat exchanger dirty

Clean the heat exchanger

Thermostatic hot water temperature limiter:  
Setting is not correct

Check the thermostatic hot water temperature 
limiter is working and correctly set

PM valve does not switch over

Replace the PM valve

Waiting time for hot water is too long

Check the pump setting in the central heating 
system

Pump setting: Constant pressure

The temperature setting on the thermostatic lead 
module is too low

Increase the temperature setting on the  
thermostatic lead module

The capillary on the thermostatic lead module is 
dirty

Clean the capillary on the thermostatic lead module 

No thermostatic lead module available

5HWUR¿WWKHWKHUPRVWDWLFOHDGPRGXOH

Noise generation

Noise generated in the station

Pipe clamps too tight

Loosen pipe clamps

Whistling noises during dispensing

Cold water strainer is dirty

Clean the cold water strainer

Cold water throttle valve is dirty

Clean the cold water throttle valve

Noise generated in the PM valve

Noise generated via a third route

Replace the MS disc, spring and locking ring using a 
replacement kit for PM valves,  
3rd route

Содержание KaMo Combi Port BASE XU

Страница 1: ...Uponor Combi Port BASE XU EN Installation and Operation Manual...

Страница 2: ...1 Mounting ball valve rail 12 3 2 Mounting HIU 12 3 3 Mounting UFH manifold 13 RQQHFWLRQ XQGHU RRU KHDWLQJ SLSHV 13 3 5 Connection single room controller 14 3 6 Mounting cabinet cover 14 4 Operation...

Страница 3: ...performing any work on the controller or the components connected to it disconnect the controller from the power supply as instructed The outlets are also in an inactive state under mains voltage We w...

Страница 4: ...Technical data Year built Serial number Order number Production location 1 2 ID plate example Device type Combi Port BASE XU Hz VI temperature max 95 C 7 RZ UDWH Exchanger type 1 15 l min Pressure lev...

Страница 5: ...ly check the water temperature with a gauge before touching it 1 13 Leaks If leaks occur you must follow the instructions below ORVH DOO VKXW R YDOYHV LPPHGLDWHO Repair the lick in the appropriate man...

Страница 6: ...a a stainless steel plate heat exchanger following the RZ WKURXJK SULQFLSOH 7KH VSHFL F WKHUPDO FKDUDFWHULVWLF RI WKH KHDW exchanger ensures excellent cool down of the heating water and low UHWXUQ RZ...

Страница 7: ...ating return 1 Plate heat exchanger 4 Sensor pocket HM M10x1 wet diving 5 Flushing valve 6 Air vent 7 Heat meter distance piece 9 Strainer 13 DHW temparature controller TWB 18 Union nut 19 Pump 26 Wat...

Страница 8: ...8 l Uponor Combi Port BASE XU l Installation manual WZ FIL 2 3 System example...

Страница 9: ...r Installation L HUHQW VLQJOH URRP FRQWUROOHU FDQ EH FRQQHFWHG 6HH DYDLODEOH controler later in this chapter 2 4 2 Connecting ball valves Supply lines can be connected to Combi Port Base XU from top o...

Страница 10: ...matrix is a fully equipped range of components for room temperature control optionally via radio or wired The unique auto balancing technology eliminates the need for manual balancing of the loops The...

Страница 11: ...Combi Port 6 8 ZLWK XQGHU RRU KHDWLQJ PDQLIROG 6LQJOH URRP FRQWURO XQLW Smatrix is mounted and wired at the manifold System components 1 Combi Port BASE XU 2 UFH manifold 3 Single room controller Appl...

Страница 12: ...DWHULDO Note Pay attention to horizontal alignment 3 2 Mounting HIU 1 6FUHZ 8 WR WKH ZDOO ZLWK HQFORVHG LQJ PDWHULDO 2 Join HIU to the ball valves Note The flat seals provided must be inserted before...

Страница 13: ...alignment 2 Drill holes 3 6FUHZ 8 PDQLIROG ZLWK HQFORVHG LQJ PDWHULDO WR WKH ZDOO Connect UFH manifold to the ball valves on the station 3 4 Connection underfloor heating pipes Note Construction and...

Страница 14: ...manifold on desired L brackets 2 Install the actuators on the UFH manifold return Electrical connection see relevant instruction of the single room controller Note Install the Interface unit allways o...

Страница 15: ...ting supply and return as well as the hot and cold water correctly 7R OO WKH FHQWUDO KHDWLQJ V VWHP LQVWDOO D OOLQJ DQG GUDLQLQJ valve on site at a suitable central point Observe the hydraulic diagram...

Страница 16: ...Port XU electrically see wiring diagram 2 Connect individual room controller please follow to the corresponding instruction Smatrix or Flexiboard 3 Coding of actuator please follow to the correspondi...

Страница 17: ...hten the connections When tighte ning connections always lock the opposite side Vent the accumulated air in the heat interface unit by opening the venting screw Observe the system operating pressure T...

Страница 18: ...e Please note Make sure not to bend or break the capillary line Using a welding wire slide out the locking tabs next to the adjustment number on the left and right in the direction of the union nut If...

Страница 19: ...bi Port BASE XU l Installation manual l 19 40 4 7 Thermostatic heating limiter Through the thermostatic heating limiter 40 in the heating circuit the return temperature of the primary heating return i...

Страница 20: ...min Wilo Yonos PARA RS 15 6 25 6 30 6 1 230 V Rp Rp 1 Rp 1 p kPa H m H P1 W Q m h Q Q Q l s Q Q Q Igpm Q Q Q m h Q Q max m ax LOR RQRV 3 5 56 S F FRQVWDQW 0 0 5 1 0 1 5 2 0 2 5 3 0 0 0 2 0 4 0 6 0 8...

Страница 21: ...unscrewed the valves will shoot out of the thread Never tum the valves counter clockwise more than 4 times CLOSE 1 2 3 4 OPEN 0 25 x 1 5 L min Room heating circuit data Raum Heizkreis Daten Ruimte en...

Страница 22: ...QJ 3 hexagon 32 mm RPSOHWHO RSHQ WKH E SDVV WWLQJ 3 Allen key 6 mm V D UHVXOW ZDWHU RZV IURP WKH OLQH YLD WKH E SDVV RZ UHWXUQ 3 QG RI XVKLQJ ORVLQJ WKH E SDVV WWLQJ 3 Allen key 6 mm Assemble the prot...

Страница 23: ...ter This enables you to dispense unlimited amounts of hot water Restrictions are only imposed by the central heating The heating lines or heat exchangers are permanently maintained at a basic temperat...

Страница 24: ...heating return E Secondary heating supply F Secondary heating return Malfunctions and maintenance A visual inspection is required every 3 to 6 months The device seal must be checked If drops form or w...

Страница 25: ...336 50 215 80 30 50 1 3 4 Euro 7 x 3 4 Euro 460 355 87 73 385 336 50 215 80 30 50 1 3 4 Euro 8 x 3 4 Euro 510 355 87 73 435 336 50 215 80 30 50 1 3 4 Euro 9 x 3 4 Euro 560 355 87 73 485 336 50 215 80...

Страница 26: ...TSYUDQLDQJ 3 MCDW MCDQTMF 4DBGMHRBGD MCDQTMFDM RBGD GHMYTFDE 7 TRRBGMHSS TRRBGMHSS MFDO A B Q QQS LDQ TMC QTBJED KKD 2DBGSD E Q CDM KK TRCQ BJKHBGDM DMDGLHF HD 7DHSDQF AD RNVHD 6D 6 3 Cabinet cover 6...

Страница 27: ...Uponor Combi Port BASE XU l Installation manual l 27 6 5 Flushing valve E O Z Z K E O Z Z K O K Z Z E O K Z Z E...

Страница 28: ...KHDWLQJ YROXPH RZ SDVVHV WKURXJK the heat exchanger KHFN WKH YROXPH RZ GXULQJ PD LPXP GLVSHQVLQJ using heat meters Combi Port BASE XU 15 l min Combi Port BASE XU 21 l min Heat meter type not supporte...

Страница 29: ...ntrol head setting Actuator for second safety not connected electrically Actuator for second safety closed without current Connect this electrically 6HWWLQJ 9 YDOXH RI RQH YDOYH LV QRW FRUUHFW KHFN WK...

Страница 30: ...LVWXQJ LWHU PLQ 0 5 10 15 20 25 30 35 40 5 10 15 20 25 PD LPXP 8 Performance curves Primary heating demand and return temperatures Heating side primary Primary heating demand litre h Pressure losses e...

Страница 31: ...5 10 15 20 25 Zapfleistung Liter min 65 C 70 C 0 00 5 00 10 00 15 00 20 00 25 00 30 00 35 00 40 00 45 00 50 00 55 00 5 10 15 20 25 PD LPXP Primary heating demand and return temperatures Primary heatin...

Страница 32: ...25 DSIOHLVWXQJ LWHU PLQ 0 0 5 0 10 0 15 0 20 0 25 0 30 0 35 0 40 0 5 10 15 20 25 PD LPXP Primary heating demand and return temperatures Heating side primary Primary heating demand litre h Pressure lo...

Страница 33: ...00 800 1000 1200 1400 1600 5 10 15 20 25 DSIOHLVWXQJ LWHU PLQ 0 5 10 15 20 25 30 35 40 45 5 10 15 20 25 PD LPXP Primary heating demand and return temperatures Primary heating demand litre h Return tem...

Страница 34: ...10 0 15 0 20 0 25 0 30 0 35 0 40 0 5 10 15 20 25 30 PD LPXP Primary heating demand and return temperatures Heating side primary Primary heating demand litre h Pressure losses e g 0 05 bar for heat me...

Страница 35: ...5 10 15 20 25 30 DSIOHLVWXQJ LWHU PLQ 0 5 10 15 20 25 30 35 40 45 5 10 15 20 25 30 PD LPXP Primary heating demand and return temperatures Primary heating demand litre h Return temperature C Cold water...

Страница 36: ...PDNH FKDQJHV ZLWKRXW SULRU QRWL FDWLRQ WR WKH VSHFL FDWLRQ RI LQFRUSRUDWHG FRPSRQHQWV LQ OLQH ZLWK LWV SROLF RI FRQWLQXRXV LPSURYHPHQW DQG GHYHORSPHQW 1096067 01 2020 Production 8SRQRU H Uponor GmbH...

Отзывы: