background image

4  l  Uponor Combi Port BASE XU  l  Installation manual

In the case of installations in the public sector (multi family homes, 
hotels, retirement homes, hospitals, sports halls, etc.) care must be 
taken to ensure that the heated drinking water temperature does not 
fall below 60°C and the circulating water re-entering the unit reaches 
a minimum temperature of 55°C. This requires accurate calculation 
and precise adjustment of the circulating line.

The system is maintained in compliance with DIN EN 806-5 or, outside 
Germany, in accordance with national regulations or standards.

Use-related wear of wearing parts, such as pumps, built-in valves 
(moving parts, PM valves, etc.) are not considered as defects.

We recommend a maintenance cycle especially for example for the 
built-in heat exchanger (test, dirt, sludge, lime), PM valve (functional 

WHVWGLUW¿OWHUVKXWRႇYDOYHVIXQFWLRQDOWHVWYDOYHVVXFKDVD

thermostatic lead module, thermostatic hot water temperature limiter, 

]RQHYDOYHVLQMHFWLRQYDOYHGLႇHUHQWLDOSUHVVXUHUHJXODWRUSXPS

volume measuring unit, thermal premixer or other parts.

5  Please instruct the system users properly and provide them with 

these installation and operating instructions together with the 
inventory documents.

 

Please check that the units are complete. Any screws that 
are loosened during transport should be retightened.

 

In the event of leaks that occur during the pressure test, be 

VXUHWRGHSUHVVXULVHWKHXQLWEHIRUHUHSODFLQJDQ\DႇHFWHG

components.

 

Never remove individual parts of the unit (or any other built-in 
components) while the system is still under pressure (risk of injury).

 

If you have any questions about correct operation or function, 
please contact your supplier. Of course you are also welcome 
to contact us directly anytime.

1.1 

Validity of the instructions

These installation and operating instructions apply exclusively to 
the manufacturer’s unit. The type can be found on the ID plate.

The ID plate is located on the base plate of the unit. The ID plate 
contains the following information. 

•  Sales

•  Created by

•  Device type

•  Technical data

•  Year built

•  Serial number

•  Order number

•  Production location

1.2 

ID plate (example)

Device type:

Combi Port BASE XU

Hz-VI temperature: 

max. 95°C

7::ÀRZUDWH

Exchanger type 1; 15 l/min

Pressure level Hz/TWW: 

PN 10/PN 6

Year built:

2020

Serial number: D-10-0026036

Order number: 102628 

Made in Germany

1.3 

Related documents and regulations

•  Additional documents are valid in conjunction with 

these installation and operating instructions.

•  When carrying out service work on the unit, it is essential to 

observe all instructions for supplementary components and 
components of the heating system.

•  In all service work pay attention to:

-  the recognised technical rules for safe and 

professional operations

-  the statutory regulations for accident prevention

-  the statutory environmental protection regulations

-  the stipulations of employer’s liability insurance associations

-  the relevant safety conditions of the DIN, EN, DVGW, DWGW, 

VDE and AGFW standards

-  the relevant national and EU regulations for other countries

 DQGWKHUHOHYDQWVSHFL¿FDWLRQVIRUWKHUHFRJQLVHGUXOHV

of engineering

1.4 

Document retention

•  You should keep these instructions and all other applicable 

documents in a safe place, so that they are always available.

•  Make sure to hand over all the documents to the operator.

1.5 

Correct operation

The heat interface unit is intended exclusively for drinking water 
heating, control of the downstream domestic heating system and 
the measurement of heating energy and cold water consumption 
for an apartment or similar unit.

Any other or further use is considered improper use. The 
manufacturer/supplier is not liable for resulting damages. The risk 
is borne solely by the user. Intended use also includes observance 
of all relevant documents and compliance with the inspection and 
maintenance conditions.

Under no circumstances should you deviate from the values given 
in the technical data.

1.6 

Personnel and qualifications

The heat interface unit may be operated by the operator or by 
personnel authorised by the operator. Service work (assembly, 
commissioning and maintenance) on the heat interface unit 
requires specialist knowledge. In general, only authorised specialist 
tradesmen are allowed to carry out service work on the heat 
interface unit. 

Содержание KaMo Combi Port BASE XU

Страница 1: ...Uponor Combi Port BASE XU EN Installation and Operation Manual...

Страница 2: ...1 Mounting ball valve rail 12 3 2 Mounting HIU 12 3 3 Mounting UFH manifold 13 RQQHFWLRQ XQGHU RRU KHDWLQJ SLSHV 13 3 5 Connection single room controller 14 3 6 Mounting cabinet cover 14 4 Operation...

Страница 3: ...performing any work on the controller or the components connected to it disconnect the controller from the power supply as instructed The outlets are also in an inactive state under mains voltage We w...

Страница 4: ...Technical data Year built Serial number Order number Production location 1 2 ID plate example Device type Combi Port BASE XU Hz VI temperature max 95 C 7 RZ UDWH Exchanger type 1 15 l min Pressure lev...

Страница 5: ...ly check the water temperature with a gauge before touching it 1 13 Leaks If leaks occur you must follow the instructions below ORVH DOO VKXW R YDOYHV LPPHGLDWHO Repair the lick in the appropriate man...

Страница 6: ...a a stainless steel plate heat exchanger following the RZ WKURXJK SULQFLSOH 7KH VSHFL F WKHUPDO FKDUDFWHULVWLF RI WKH KHDW exchanger ensures excellent cool down of the heating water and low UHWXUQ RZ...

Страница 7: ...ating return 1 Plate heat exchanger 4 Sensor pocket HM M10x1 wet diving 5 Flushing valve 6 Air vent 7 Heat meter distance piece 9 Strainer 13 DHW temparature controller TWB 18 Union nut 19 Pump 26 Wat...

Страница 8: ...8 l Uponor Combi Port BASE XU l Installation manual WZ FIL 2 3 System example...

Страница 9: ...r Installation L HUHQW VLQJOH URRP FRQWUROOHU FDQ EH FRQQHFWHG 6HH DYDLODEOH controler later in this chapter 2 4 2 Connecting ball valves Supply lines can be connected to Combi Port Base XU from top o...

Страница 10: ...matrix is a fully equipped range of components for room temperature control optionally via radio or wired The unique auto balancing technology eliminates the need for manual balancing of the loops The...

Страница 11: ...Combi Port 6 8 ZLWK XQGHU RRU KHDWLQJ PDQLIROG 6LQJOH URRP FRQWURO XQLW Smatrix is mounted and wired at the manifold System components 1 Combi Port BASE XU 2 UFH manifold 3 Single room controller Appl...

Страница 12: ...DWHULDO Note Pay attention to horizontal alignment 3 2 Mounting HIU 1 6FUHZ 8 WR WKH ZDOO ZLWK HQFORVHG LQJ PDWHULDO 2 Join HIU to the ball valves Note The flat seals provided must be inserted before...

Страница 13: ...alignment 2 Drill holes 3 6FUHZ 8 PDQLIROG ZLWK HQFORVHG LQJ PDWHULDO WR WKH ZDOO Connect UFH manifold to the ball valves on the station 3 4 Connection underfloor heating pipes Note Construction and...

Страница 14: ...manifold on desired L brackets 2 Install the actuators on the UFH manifold return Electrical connection see relevant instruction of the single room controller Note Install the Interface unit allways o...

Страница 15: ...ting supply and return as well as the hot and cold water correctly 7R OO WKH FHQWUDO KHDWLQJ V VWHP LQVWDOO D OOLQJ DQG GUDLQLQJ valve on site at a suitable central point Observe the hydraulic diagram...

Страница 16: ...Port XU electrically see wiring diagram 2 Connect individual room controller please follow to the corresponding instruction Smatrix or Flexiboard 3 Coding of actuator please follow to the correspondi...

Страница 17: ...hten the connections When tighte ning connections always lock the opposite side Vent the accumulated air in the heat interface unit by opening the venting screw Observe the system operating pressure T...

Страница 18: ...e Please note Make sure not to bend or break the capillary line Using a welding wire slide out the locking tabs next to the adjustment number on the left and right in the direction of the union nut If...

Страница 19: ...bi Port BASE XU l Installation manual l 19 40 4 7 Thermostatic heating limiter Through the thermostatic heating limiter 40 in the heating circuit the return temperature of the primary heating return i...

Страница 20: ...min Wilo Yonos PARA RS 15 6 25 6 30 6 1 230 V Rp Rp 1 Rp 1 p kPa H m H P1 W Q m h Q Q Q l s Q Q Q Igpm Q Q Q m h Q Q max m ax LOR RQRV 3 5 56 S F FRQVWDQW 0 0 5 1 0 1 5 2 0 2 5 3 0 0 0 2 0 4 0 6 0 8...

Страница 21: ...unscrewed the valves will shoot out of the thread Never tum the valves counter clockwise more than 4 times CLOSE 1 2 3 4 OPEN 0 25 x 1 5 L min Room heating circuit data Raum Heizkreis Daten Ruimte en...

Страница 22: ...QJ 3 hexagon 32 mm RPSOHWHO RSHQ WKH E SDVV WWLQJ 3 Allen key 6 mm V D UHVXOW ZDWHU RZV IURP WKH OLQH YLD WKH E SDVV RZ UHWXUQ 3 QG RI XVKLQJ ORVLQJ WKH E SDVV WWLQJ 3 Allen key 6 mm Assemble the prot...

Страница 23: ...ter This enables you to dispense unlimited amounts of hot water Restrictions are only imposed by the central heating The heating lines or heat exchangers are permanently maintained at a basic temperat...

Страница 24: ...heating return E Secondary heating supply F Secondary heating return Malfunctions and maintenance A visual inspection is required every 3 to 6 months The device seal must be checked If drops form or w...

Страница 25: ...336 50 215 80 30 50 1 3 4 Euro 7 x 3 4 Euro 460 355 87 73 385 336 50 215 80 30 50 1 3 4 Euro 8 x 3 4 Euro 510 355 87 73 435 336 50 215 80 30 50 1 3 4 Euro 9 x 3 4 Euro 560 355 87 73 485 336 50 215 80...

Страница 26: ...TSYUDQLDQJ 3 MCDW MCDQTMF 4DBGMHRBGD MCDQTMFDM RBGD GHMYTFDE 7 TRRBGMHSS TRRBGMHSS MFDO A B Q QQS LDQ TMC QTBJED KKD 2DBGSD E Q CDM KK TRCQ BJKHBGDM DMDGLHF HD 7DHSDQF AD RNVHD 6D 6 3 Cabinet cover 6...

Страница 27: ...Uponor Combi Port BASE XU l Installation manual l 27 6 5 Flushing valve E O Z Z K E O Z Z K O K Z Z E O K Z Z E...

Страница 28: ...KHDWLQJ YROXPH RZ SDVVHV WKURXJK the heat exchanger KHFN WKH YROXPH RZ GXULQJ PD LPXP GLVSHQVLQJ using heat meters Combi Port BASE XU 15 l min Combi Port BASE XU 21 l min Heat meter type not supporte...

Страница 29: ...ntrol head setting Actuator for second safety not connected electrically Actuator for second safety closed without current Connect this electrically 6HWWLQJ 9 YDOXH RI RQH YDOYH LV QRW FRUUHFW KHFN WK...

Страница 30: ...LVWXQJ LWHU PLQ 0 5 10 15 20 25 30 35 40 5 10 15 20 25 PD LPXP 8 Performance curves Primary heating demand and return temperatures Heating side primary Primary heating demand litre h Pressure losses e...

Страница 31: ...5 10 15 20 25 Zapfleistung Liter min 65 C 70 C 0 00 5 00 10 00 15 00 20 00 25 00 30 00 35 00 40 00 45 00 50 00 55 00 5 10 15 20 25 PD LPXP Primary heating demand and return temperatures Primary heatin...

Страница 32: ...25 DSIOHLVWXQJ LWHU PLQ 0 0 5 0 10 0 15 0 20 0 25 0 30 0 35 0 40 0 5 10 15 20 25 PD LPXP Primary heating demand and return temperatures Heating side primary Primary heating demand litre h Pressure lo...

Страница 33: ...00 800 1000 1200 1400 1600 5 10 15 20 25 DSIOHLVWXQJ LWHU PLQ 0 5 10 15 20 25 30 35 40 45 5 10 15 20 25 PD LPXP Primary heating demand and return temperatures Primary heating demand litre h Return tem...

Страница 34: ...10 0 15 0 20 0 25 0 30 0 35 0 40 0 5 10 15 20 25 30 PD LPXP Primary heating demand and return temperatures Heating side primary Primary heating demand litre h Pressure losses e g 0 05 bar for heat me...

Страница 35: ...5 10 15 20 25 30 DSIOHLVWXQJ LWHU PLQ 0 5 10 15 20 25 30 35 40 45 5 10 15 20 25 30 PD LPXP Primary heating demand and return temperatures Primary heating demand litre h Return temperature C Cold water...

Страница 36: ...PDNH FKDQJHV ZLWKRXW SULRU QRWL FDWLRQ WR WKH VSHFL FDWLRQ RI LQFRUSRUDWHG FRPSRQHQWV LQ OLQH ZLWK LWV SROLF RI FRQWLQXRXV LPSURYHPHQW DQG GHYHORSPHQW 1096067 01 2020 Production 8SRQRU H Uponor GmbH...

Отзывы: