Uponor Combi Port BASE XU l Installation manual l 21
4.9
Hydraulic balancing of UFH manifold
The heating manifold can be delivered in sizes of 2-15 loops. The
necessary hydraulic balancing within the circuits have to be set at
regulation valves placed in the return manifold as follow:
1
Remove the cap from the valve inlet in return manifold bar.
2
Turn the cap over so that the square connector is down.
Put the cap on the regulation valve and close it.
3
Open the cap 0,25 x.
4
Open the cap as many turns as necessary until you reach the
GHVLUHGORRSVHWWLQJ7KHUHTXLUHGÀRZUDWHWREHIRXQGLQWKH
planning documentation.
Warning!
Hazard to life due to valves under pressure:
When completely unscrewed, the valves will shoot out of
the thread.
Never tum the valves counter clockwise more than
4
times.
CLOSE
1
2
3
4
OPEN
0,25 x
1,5 L/min
Room heating circuit data
Raum-Heizkreis-Daten
Ruimte- en verwarminggroepsgegevens
Données des pièces - circuits de chauffage
Dati circuito riscaldamento locale
Room No.
Raum-Nr.
Ruimte-Nr.
N° de la pièce
Num. locale
Heating circuit No.
Heizkreis-Nr.
Verwarmingsgroep nr.
N° du circuits de
chauffage
Num. circuito
riscaldamento locale
Uponor floor heating calculations
Uponor Fußbodenheizungsberechnung
Uponor vloerverwarmingsberekening
Calculation du chauffage par le sol Uponor
Calcolo riscaldamento a pannelli radianti Uponor
1
1
2
3
4
1
2
3
4
5
0,5
3
1
4
2
Valve adjustment
Ventileinstellung
Ventielvoorinstelling
Réglage de la vanne
Tartura della valvola
2
5
2
4
1,5
Quantity of water
Wassermenge
Hoeveelheid water
Quantité d’eau
Quantità di acqua
L/min
Содержание KaMo Combi Port BASE XU
Страница 1: ...Uponor Combi Port BASE XU EN Installation and Operation Manual...
Страница 8: ...8 l Uponor Combi Port BASE XU l Installation manual WZ FIL 2 3 System example...
Страница 27: ...Uponor Combi Port BASE XU l Installation manual l 27 6 5 Flushing valve E O Z Z K E O Z Z K O K Z Z E O K Z Z E...