12 l Uponor Combi Port BASE XU l Installation manual
3
Installation
3.1
Mounting ball valve rail
1
6FUHZEDOOYDOYHUDLOWRWKHZDOOZLWKHQFORVHG¿[LQJPDWHULDO
Note
Pay attention to horizontal alignment!
3.2
Mounting HIU
1
6FUHZ+,8WRWKHZDOOZLWKHQFORVHG¿[LQJPDWHULDO
2
Join HIU to the ball valves.
Note
The flat seals provided must be inserted before joining.
The seal of the screw connections should be checked!
Please consider:
The corresponding primary supply lines must be installed
at the ball valves ¾”.
Содержание KaMo Combi Port BASE XU
Страница 1: ...Uponor Combi Port BASE XU EN Installation and Operation Manual...
Страница 8: ...8 l Uponor Combi Port BASE XU l Installation manual WZ FIL 2 3 System example...
Страница 27: ...Uponor Combi Port BASE XU l Installation manual l 27 6 5 Flushing valve E O Z Z K E O Z Z K O K Z Z E O K Z Z E...