Uponor Combi Port BASE XU l Installation manual l 13
3.3
Mounting UFH manifold
1
Mark for drilling wholes for UFH manifold.
Note
Pay attention to horizontal alignment!
2
Drill holes.
3
PDQLIROGZLWKHQFORVHG¿[LQJPDWHULDOWRWKHZDOO
Connect UFH manifold to the ball valves on the station.
3.4
Connection underfloor heating pipes
Note
Construction and installation of underfloor heating
acc EN 1264.
1
&RQQHFWLRQRIXQGHUÀRRUKHDWLQJSLSHVRQWKHPDQLIROG
2
Protocol the loop lengths of each loop
SW 24
SW 30
Содержание KaMo Combi Port BASE XU
Страница 1: ...Uponor Combi Port BASE XU EN Installation and Operation Manual...
Страница 8: ...8 l Uponor Combi Port BASE XU l Installation manual WZ FIL 2 3 System example...
Страница 27: ...Uponor Combi Port BASE XU l Installation manual l 27 6 5 Flushing valve E O Z Z K E O Z Z K O K Z Z E O K Z Z E...