30 l Uponor Combi Port BASE XU l Installation manual
0,00
0,10
0,20
0,30
0,40
0,50
0,60
0,70
0,80
0,90
1,00
200
500
800
1.100
1.400
'UX
FNYH
UO
X
VWE
DU
0,00
0,10
0,20
0,30
0,40
0,50
0,60
0,70
0,80
0,90
1,00
1,10
1,20
1,30
1,40
1,50
1,60
1,70
1,80
1,90
2,00
5,0
10,0
15,0
20,0
25,0
'UX
FNYH
UO
X
VWE
DU
=DSIOHLVWXQJ/LWHUPLQ
PD[LPXP
PD[LPXP
48°C
0
200
400
600
800
1.000
1.200
1.400
1.600
5
10
15
20
25
=DSIOHLVWXQJ/LWHUPLQ
0
5
10
15
20
25
30
35
40
45
5
10
15
20
25
ϱϱΣ
ϲϬΣ
ϱϬΣ
ϱϮΣ
ϳϬΣ
ϴϬΣ
ϲϱΣ
ϳϱΣ
ϴϱΣ
ϱϱΣ
ϲϬΣ
ϱϬΣ
ϰϴΣ
ϱϮΣ
ϳϬΣ
ϴϬΣ
ϲϱΣ
ϳϱΣ
ϴϱΣ
PD[LPXP
0
200
400
600
800
1000
1200
1400
1600
5
10
15
20
25
=DSIOHLVWXQJ/LWHUPLQ
0
5
10
15
20
25
30
35
40
5
10
15
20
25
ϱϱΣ
ϲϬΣ
ϳϬΣ
ϴϬΣ
ϲϱΣ
ϳϱΣ
ϴϱΣ
ϱϱΣ
ϲϬΣ
ϳϬΣ
ϴϬΣ
ϲϱΣ
ϳϱΣ
ϴϱΣ
PD[LPXP
8 Performance curves
Primary heating demand and return temperatures
Heating side (primary)
Primary heating demand litre/h
Pressure losses, e.g. 0,05 bar for heat meter Qn 1,5, have to be added.
Domestic water side (secondary)
Pressure loss bar
Pressure loss bar
Primary heating demand litre/h
Return temperature °C
Return temperature °C
Primary heating demand litre/h
Cold water warming 35 K (10 - 45 °C)
Cold water warming 40 K (10 - 50 °C)
Taping capacity litre/min
Taping capacity litre/min
Taping capacity litre/min
Taping capacity litre/min
Taping capacity litre/min
Pressure domestic water heat
exchanger 14 plates (15 l/min.)
Primary heating supply:
Primary heating supply:
Содержание KaMo Combi Port BASE XU
Страница 1: ...Uponor Combi Port BASE XU EN Installation and Operation Manual...
Страница 8: ...8 l Uponor Combi Port BASE XU l Installation manual WZ FIL 2 3 System example...
Страница 27: ...Uponor Combi Port BASE XU l Installation manual l 27 6 5 Flushing valve E O Z Z K E O Z Z K O K Z Z E O K Z Z E...