22 l Uponor Combi Port BASE XU l Installation manual
4.10
Flush the primary heating system
1
Check that the ball valves (
1
) and the drain cock (
4
) are closed on
the station side.
2
Flush
- Opening the ball valves on riser side (
2
)
5HPRYDORIWKHSURWHFWLRQFDSRIWKHE\SDVV¿WWLQJ
3
)
(hexagon 32 mm)
&RPSOHWHO\RSHQWKHE\SDVV¿WWLQJ
3
) (Allen key 6 mm)
$VDUHVXOWZDWHUÀRZVIURPWKHOLQHYLDWKHE\SDVV
ÀRZ!UHWXUQ
3
(QGRIÀXVKLQJ
&ORVLQJWKHE\SDVV¿WWLQJ
3
) (Allen key 6 mm)
- Assemble the protective cap (hexagon 32 mm)
4.11
Fill/flush and vent
)LOODQGÀXVKWKHKHDWLQJVLGHZLWKFROGZDWHUXVLQJ&RPEL3RUW
%$6(;8¿OOLQJDQGÀXVKLQJVHW7KHUHIRULQVWDOOWKLVVHWEHWZHHQ
heating and cold water side.
Vent the heat interface unit at the air vent
6
.
1
4
3
2
Filling loop
6
6
Содержание KaMo Combi Port BASE XU
Страница 1: ...Uponor Combi Port BASE XU EN Installation and Operation Manual...
Страница 8: ...8 l Uponor Combi Port BASE XU l Installation manual WZ FIL 2 3 System example...
Страница 27: ...Uponor Combi Port BASE XU l Installation manual l 27 6 5 Flushing valve E O Z Z K E O Z Z K O K Z Z E O K Z Z E...