Uponor Combi Port BASE XU  l  Installation manual  l  23

Occupant information

5.1 

Important information about these instruc-
tions

These user instructions contain important information for the 
occupant on the operation of the system with a heat interface unit. 

Following these instructions will help avoid hazards and downtime 
and increase the reliability and life of the heat interface unit. To 
ensure the correct and safe operation of the heat interface unit, 
you must read and follow the user information. 

Document retention 

You should keep this information and all other applicable documents 
in a safe place, so that they are always available. Make sure to hand 
over all the documents to the next occupants of the apartment. 

Commissioning and installation

The installation and commissioning of the heat interface unit may 
only be installed and commissioned by a 

specialist installation 

company

.

After commissioning, the heat interface unit operates automatically.

5.2 

Function and energy savings

The heat interface unit is a compact station and can be operated in a 
system with several units or as a supplement to an existing heating 
system. The heat interface unit is assigned to a residential unit and is 
used to measure and control central heating and hydronic heating.

The heat interface unit combines:

‡ K\GURQLFKHDWLQJLQWKHÀRZV\VWHPYLDDSODWHKHDWH[FKDQJHU

(water heating is controlled without auxiliary energy),

•  the metering of the energy consumption for central heating 

and hot water and, as an option, the amount of cold water,

•  the option of controlling an apartment heating system.

Hot water is only prepared as needed. Service water is not stored. 
This is one of the most convenient ways to heat fresh water. This 
enables you to dispense unlimited amounts of hot water. Restrictions 
are only imposed by the central heating.

The heating lines or heat exchangers are permanently maintained 
at a basic temperature, usually 45°C.

7RHQVXUHWKHHQWLUHV\VWHPLVRSHUDWHGLQDQHQHUJ\HႈFLHQWZD\

this temperature should not be increased.

Hydronic heating

The cold water supply for the apartment is provided via the central 
house connection and distribution line as far as your apartment.

$W\RXUKHDWLQWHUIDFHXQLWWKHUHLVDFHQWUDOVKXWRႇEDOOYDOYHIRUFROG

water (

C

DQGDVKXWRႇEDOOYDOYHIRULQVWDOODWLRQSXUSRVHVIRU\RXU

apartment distribution line (optional).

If you intend to be away for more than 72 hours, we recommend 

VKXWWLQJRႇWKHFROGZDWHUEDOOYDOYH

C

) and depressurising the lines by 

opening a tap and closing it once all the water in the pipe has run out. 

All ball valves should be turned at regular intervals (about once a 
month). In other words they should be closed and re-opened.

The ball valve of the apartment distribution system (cold water (

A

)  

(optional) and hot water (

B

)) is only to be closed for assembly purposes!

$OOZDWHUSLSHVDUH¿OOHGDQGSUHVVXULVHG

Water hygiene

$OWKRXJK\RXKDYHDKRWZDWHUV\VWHPWKDWIROORZVWKHÀRZSULQFLSOH

which is the most hygienic method of water heating, you should

DOZD\VÀXVK\RXUZDWHUSLSHVLI\RXKDYHEHHQDZD\IURP\RXUKRPH

for several days and no water has been taken from the system (e.g. 
when returning from holidays). You should let the water run for one or 
two minutes. The water must be allowed to run for about 1-2 minutes 
at least every 7 days.

Heating

The pipes of the apartment heating system usually come from your 

KHDWLQWHUIDFHXQLW,WLVSRVVLEOHWRFRPSOHWHO\VKXWRႇDOOWKHKHDWLQJ

pipes of each apartment in the heat interface unit. It is possible to run 

WKHKHDWLQJDOO\HDUURXQG<RXFDQLQÀXHQFH\RXUHQHUJ\FRQVXPSWLRQ

by the way you choose to use the heating system.

Содержание KaMo Combi Port BASE XU

Страница 1: ...Uponor Combi Port BASE XU EN Installation and Operation Manual...

Страница 2: ...1 Mounting ball valve rail 12 3 2 Mounting HIU 12 3 3 Mounting UFH manifold 13 RQQHFWLRQ XQGHU RRU KHDWLQJ SLSHV 13 3 5 Connection single room controller 14 3 6 Mounting cabinet cover 14 4 Operation...

Страница 3: ...performing any work on the controller or the components connected to it disconnect the controller from the power supply as instructed The outlets are also in an inactive state under mains voltage We w...

Страница 4: ...Technical data Year built Serial number Order number Production location 1 2 ID plate example Device type Combi Port BASE XU Hz VI temperature max 95 C 7 RZ UDWH Exchanger type 1 15 l min Pressure lev...

Страница 5: ...ly check the water temperature with a gauge before touching it 1 13 Leaks If leaks occur you must follow the instructions below ORVH DOO VKXW R YDOYHV LPPHGLDWHO Repair the lick in the appropriate man...

Страница 6: ...a a stainless steel plate heat exchanger following the RZ WKURXJK SULQFLSOH 7KH VSHFL F WKHUPDO FKDUDFWHULVWLF RI WKH KHDW exchanger ensures excellent cool down of the heating water and low UHWXUQ RZ...

Страница 7: ...ating return 1 Plate heat exchanger 4 Sensor pocket HM M10x1 wet diving 5 Flushing valve 6 Air vent 7 Heat meter distance piece 9 Strainer 13 DHW temparature controller TWB 18 Union nut 19 Pump 26 Wat...

Страница 8: ...8 l Uponor Combi Port BASE XU l Installation manual WZ FIL 2 3 System example...

Страница 9: ...r Installation L HUHQW VLQJOH URRP FRQWUROOHU FDQ EH FRQQHFWHG 6HH DYDLODEOH controler later in this chapter 2 4 2 Connecting ball valves Supply lines can be connected to Combi Port Base XU from top o...

Страница 10: ...matrix is a fully equipped range of components for room temperature control optionally via radio or wired The unique auto balancing technology eliminates the need for manual balancing of the loops The...

Страница 11: ...Combi Port 6 8 ZLWK XQGHU RRU KHDWLQJ PDQLIROG 6LQJOH URRP FRQWURO XQLW Smatrix is mounted and wired at the manifold System components 1 Combi Port BASE XU 2 UFH manifold 3 Single room controller Appl...

Страница 12: ...DWHULDO Note Pay attention to horizontal alignment 3 2 Mounting HIU 1 6FUHZ 8 WR WKH ZDOO ZLWK HQFORVHG LQJ PDWHULDO 2 Join HIU to the ball valves Note The flat seals provided must be inserted before...

Страница 13: ...alignment 2 Drill holes 3 6FUHZ 8 PDQLIROG ZLWK HQFORVHG LQJ PDWHULDO WR WKH ZDOO Connect UFH manifold to the ball valves on the station 3 4 Connection underfloor heating pipes Note Construction and...

Страница 14: ...manifold on desired L brackets 2 Install the actuators on the UFH manifold return Electrical connection see relevant instruction of the single room controller Note Install the Interface unit allways o...

Страница 15: ...ting supply and return as well as the hot and cold water correctly 7R OO WKH FHQWUDO KHDWLQJ V VWHP LQVWDOO D OOLQJ DQG GUDLQLQJ valve on site at a suitable central point Observe the hydraulic diagram...

Страница 16: ...Port XU electrically see wiring diagram 2 Connect individual room controller please follow to the corresponding instruction Smatrix or Flexiboard 3 Coding of actuator please follow to the correspondi...

Страница 17: ...hten the connections When tighte ning connections always lock the opposite side Vent the accumulated air in the heat interface unit by opening the venting screw Observe the system operating pressure T...

Страница 18: ...e Please note Make sure not to bend or break the capillary line Using a welding wire slide out the locking tabs next to the adjustment number on the left and right in the direction of the union nut If...

Страница 19: ...bi Port BASE XU l Installation manual l 19 40 4 7 Thermostatic heating limiter Through the thermostatic heating limiter 40 in the heating circuit the return temperature of the primary heating return i...

Страница 20: ...min Wilo Yonos PARA RS 15 6 25 6 30 6 1 230 V Rp Rp 1 Rp 1 p kPa H m H P1 W Q m h Q Q Q l s Q Q Q Igpm Q Q Q m h Q Q max m ax LOR RQRV 3 5 56 S F FRQVWDQW 0 0 5 1 0 1 5 2 0 2 5 3 0 0 0 2 0 4 0 6 0 8...

Страница 21: ...unscrewed the valves will shoot out of the thread Never tum the valves counter clockwise more than 4 times CLOSE 1 2 3 4 OPEN 0 25 x 1 5 L min Room heating circuit data Raum Heizkreis Daten Ruimte en...

Страница 22: ...QJ 3 hexagon 32 mm RPSOHWHO RSHQ WKH E SDVV WWLQJ 3 Allen key 6 mm V D UHVXOW ZDWHU RZV IURP WKH OLQH YLD WKH E SDVV RZ UHWXUQ 3 QG RI XVKLQJ ORVLQJ WKH E SDVV WWLQJ 3 Allen key 6 mm Assemble the prot...

Страница 23: ...ter This enables you to dispense unlimited amounts of hot water Restrictions are only imposed by the central heating The heating lines or heat exchangers are permanently maintained at a basic temperat...

Страница 24: ...heating return E Secondary heating supply F Secondary heating return Malfunctions and maintenance A visual inspection is required every 3 to 6 months The device seal must be checked If drops form or w...

Страница 25: ...336 50 215 80 30 50 1 3 4 Euro 7 x 3 4 Euro 460 355 87 73 385 336 50 215 80 30 50 1 3 4 Euro 8 x 3 4 Euro 510 355 87 73 435 336 50 215 80 30 50 1 3 4 Euro 9 x 3 4 Euro 560 355 87 73 485 336 50 215 80...

Страница 26: ...TSYUDQLDQJ 3 MCDW MCDQTMF 4DBGMHRBGD MCDQTMFDM RBGD GHMYTFDE 7 TRRBGMHSS TRRBGMHSS MFDO A B Q QQS LDQ TMC QTBJED KKD 2DBGSD E Q CDM KK TRCQ BJKHBGDM DMDGLHF HD 7DHSDQF AD RNVHD 6D 6 3 Cabinet cover 6...

Страница 27: ...Uponor Combi Port BASE XU l Installation manual l 27 6 5 Flushing valve E O Z Z K E O Z Z K O K Z Z E O K Z Z E...

Страница 28: ...KHDWLQJ YROXPH RZ SDVVHV WKURXJK the heat exchanger KHFN WKH YROXPH RZ GXULQJ PD LPXP GLVSHQVLQJ using heat meters Combi Port BASE XU 15 l min Combi Port BASE XU 21 l min Heat meter type not supporte...

Страница 29: ...ntrol head setting Actuator for second safety not connected electrically Actuator for second safety closed without current Connect this electrically 6HWWLQJ 9 YDOXH RI RQH YDOYH LV QRW FRUUHFW KHFN WK...

Страница 30: ...LVWXQJ LWHU PLQ 0 5 10 15 20 25 30 35 40 5 10 15 20 25 PD LPXP 8 Performance curves Primary heating demand and return temperatures Heating side primary Primary heating demand litre h Pressure losses e...

Страница 31: ...5 10 15 20 25 Zapfleistung Liter min 65 C 70 C 0 00 5 00 10 00 15 00 20 00 25 00 30 00 35 00 40 00 45 00 50 00 55 00 5 10 15 20 25 PD LPXP Primary heating demand and return temperatures Primary heatin...

Страница 32: ...25 DSIOHLVWXQJ LWHU PLQ 0 0 5 0 10 0 15 0 20 0 25 0 30 0 35 0 40 0 5 10 15 20 25 PD LPXP Primary heating demand and return temperatures Heating side primary Primary heating demand litre h Pressure lo...

Страница 33: ...00 800 1000 1200 1400 1600 5 10 15 20 25 DSIOHLVWXQJ LWHU PLQ 0 5 10 15 20 25 30 35 40 45 5 10 15 20 25 PD LPXP Primary heating demand and return temperatures Primary heating demand litre h Return tem...

Страница 34: ...10 0 15 0 20 0 25 0 30 0 35 0 40 0 5 10 15 20 25 30 PD LPXP Primary heating demand and return temperatures Heating side primary Primary heating demand litre h Pressure losses e g 0 05 bar for heat me...

Страница 35: ...5 10 15 20 25 30 DSIOHLVWXQJ LWHU PLQ 0 5 10 15 20 25 30 35 40 45 5 10 15 20 25 30 PD LPXP Primary heating demand and return temperatures Primary heating demand litre h Return temperature C Cold water...

Страница 36: ...PDNH FKDQJHV ZLWKRXW SULRU QRWL FDWLRQ WR WKH VSHFL FDWLRQ RI LQFRUSRUDWHG FRPSRQHQWV LQ OLQH ZLWK LWV SROLF RI FRQWLQXRXV LPSURYHPHQW DQG GHYHORSPHQW 1096067 01 2020 Production 8SRQRU H Uponor GmbH...

Отзывы: