47
4
SETTINGS AND CALIBRATIONS
47
SETTINGS AND CAL
IBRATIONS
Chapter
4
4-5.
Measurement start condition setting
Set measurement conditions by Measurement Start Condition Setting. The Measurement Start
Condition is as follows:
Operation
Main screen
→
Setting
→
Work Setting
→
Start Setting
1.
Measurement Start Condition
Set the measurement start timing.
Operation
Main screen
→
Setting
→
Work Setting
→
Start Setting
→
Start Condition
①
Only External Input
Measurement starts when the external input signal
“Start” turns OFF
→
ON
→
OFF.
Setting of “2. Measurement Start Level” is disabled.
②
External Input + Load
Measurement starts when the load crosses the
Measurement Start Level after the external input signal
“Start” turns OFF
→
ON
→
OFF.
Load
Measurement
Time or displacement
Start
OFF
ON
Section
Load
Time or displacement
Start
OFF
ON
Start
load
Measurement
Section
Start level
Load
Start point
Start point
×
Not crossing
×
Not crossing
〇
Crossing in the
negative-to-
〇
Crossing in the
positive-to-
positive direction
negative direction
Содержание DeviceNet F381A
Страница 1: ...15APR2013REV 3 10 DYNAMIC FORCE PROCESSOR F381A OPERATION MANUAL ...
Страница 9: ...Contents VIII Contents VIII M E M O ...
Страница 34: ...25 2 INSTALLATION AND CONNECTION 25 INSTALLATION AND CONNECTION Chapter 2 M E M O ...
Страница 147: ...138 8 SPECIFICATIONS 138 SPECIFICATIONS Chapter 8 8 2 Outside dimensions Unit mm ...
Страница 164: ......