CWD2005 DPC
Safety notes
chapter — page:
3—7
3.4.4 Process gas
WARNING
Establishing gas connections and working on the gas-bearing equipment of the
system may only be carried out by specialists adhering to the safety regulations,
especially those regarding explosive areas.
No gas warning system is installed in the system!
NOTE
•
The connecting parts need to be clean and free of residue. Impurities can en-
ter the combustion calorimeter and cause incorrect measurements and/or
damage.
•
The inlet pressure for the gas connections must not exceed the values speci-
fied in the technical data.
•
Each connection needs to be carefully checked for leaks. If there are any
leaks, the system will draw air, and the measurements will be incorrect.
•
Only use suitable pipes.
•
Use a separate line to drain off the condensate.
ATTENTION
The process gas must be free of condensate and dust if the system has no gas
preparation system (or gas cooler).
Содержание CWD2005 DPC
Страница 1: ...Operating instructions Combustion calorimeter CWD2005 DPC Mai 2017 V2 01 ...
Страница 12: ...CWD2005 DPC chapter page 2 2 ...
Страница 28: ...CWD2005 DPC chapter page 4 6 ...
Страница 114: ...CWD2005 DPC chapter page 9 2 ...
Страница 116: ...CWD2005 DPC chapter page 10 2 ...
Страница 119: ...CWD2005 DPC Annex chapter page 11 5 ...
Страница 120: ...CWD2005 DPC Annex February 2015 V2 00 chapter page 11 6 ...