
DC Power Supply [DPG-30R & DPG-MC60R, DPG-MC120R, DPG-MC240R]
4. Operation
35
4-1-5. Controller display
Operations are performed with the procedures below.
Based on "Figure 3-14 Power supply and external PLC connections" in the previous section,
verify the connections for the cables and connectors, and verify that the power setting is
accurately configured.
1) Startup display
Energize the DC power supplies with 380 to 480 VAC, energize the controller with 100 to 240
VAC, then turn on the power switch.
When these operations are performed, the controller's panel will show a display like those
below.
1. Each 7-segment LED turns on entirely in order from the left for 0.2 seconds
HARC
kW
A
MARC
SET
V
HARC
kW
A
MARC
SET
V
2. All 7-segment LEDs turn on for 0.2 seconds
HARC
kW
A
MARC
SET
V
3. HARC LED turns on for 0.2 seconds
HARC
kW
A
MARC
SET
V
HARC
4. kW LED turns on for 0.2 seconds
HARC
kW
A
MARC
SET
V
kW
5. A LED turns on for 0.2 seconds
HARC
kW
A
MARC
SET
V
A
6. V LED turns on for 0.2 seconds
HARC
kW
A
MARC
SET
V
V