10) Drain Valve (required) – Install the drain valve supplied as shown in Figure 9.9.
11) Low Water Cut-off (may be required by local jurisdiction) – Protection of this boiler against low water and/or
inadequate flow is provided by the UL353 certified flow switch built into the boiler. This is a water tube boiler and
this flow switch is therefore the only effective way to provide such protection. Section HG614(c ) of the 2013
ASME boiler and Pressure Vessel Code recognizes the use of a listed flow switch in lieu of a low water cut-off on
water tube boilers.
In the event that a local jurisdiction insists upon the installation of a low water cut-off with this boiler, a Low Water
Cut-off Kit (P/N 105591-01) is available that plugs into the low voltage circuit board (refer to Section X and LWCO
Instruction Sheet for LWCO location and electrical connection). Install the low water cut-off in the supply piping at the
point prescribed the local jurisdiction (generally at a point above the boiler).
If a probe type low water cut-off is used, be certain that it is located at a point in the piping from which air can escape to an
automatic air vent. Generally, this means that there should be no down-turns in the piping between the low water cut-off and
the point where the automatic air vent is installed. Failure to do this may result in nuisance boiler shut-downs due to small
amounts of air trapped around the probe.
Figure 9.9: Factory Supplied Piping and Trim installation
IX. System Piping
(continued)
Содержание K2
Страница 10: ...10 105294 05 5 15 Figure 4 1 Minimum Clearances To Combustible Construction IV Locating the Boiler continued ...
Страница 12: ...12 105294 05 5 15 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued ...
Страница 37: ...37 105294 05 5 15 THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 69: ...69 105294 05 5 15 Figure 9 2 Piping Method 1 Near Boiler Piping Heating Only IX System Piping continued ...
Страница 74: ...74 105294 05 5 15 Figure 9 6 Piping Method 1 Near Boiler Piping Shaded Boiler Loop IX System Piping continued ...
Страница 84: ...84 105294 05 5 15 Figure 10 4 Proper Installation of Header Sensor X Wiring continued ...
Страница 86: ...86 105294 05 5 15 X Wiring continued ...
Страница 87: ...87 105294 05 5 15 Figure 10 6 Internal Wiring Connections Diagram X Wiring continued ...
Страница 89: ...89 105294 05 5 15 Figure 10 8 TACO SR504 or Equivalent Zone Panel Wiring Connection Diagram X Wiring continued ...
Страница 90: ...90 105294 05 5 15 X Wiring continued Figure 10 9 Sage Zone Control Circulator Panel Wiring Connection Diagram ...
Страница 97: ...97 105294 05 5 15 Lighting and Operating Instructions XI Start Up and Checkout continued ...
Страница 106: ...106 105294 05 5 15 ...
Страница 107: ...107 105294 05 5 15 ...
Страница 108: ...108 105294 05 5 15 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...