Method 2: Direct Connection to Heating System (Generally NOT Recommended)
In some relatively rare cases it may be possible to connect this boiler directly to the heating system as is done with
conventional boilers (Figure 9.7). If this is done, the flow rate through the boiler will equal the flow rate through the system.
The flow rate through the system must therefore always remain within the limits shown in Table 9.1. For this reason, the
pressure drop through the entire system must be known.
This method is generally not recommended because it is often very difficult to accurately calculate the pressure drop
through the system. In replacement installations, it may be impossible to get an accurate measurement of the amount of
piping and number of fittings in the system. In addition, if the system is zoned, the system flow may drop well below the
minimum required when only one zone is calling for heat.
The one advantage to this method is its installation simplicity. It may make sense to use this method when the boiler is to be
installed with a new single zone system having a low-pressure drop.
Figure 9.8 shows the performance curve for the pump in each boiler model, taking into account the pressure drop through
the boiler’s heat exchanger and internal piping. These curves therefore show the flow that can be achieved through the boiler
as a function of the pressure drop through the connected piping. Calculation of the system pressure drop must be performed
by someone having familiarity with pressure drop calculations, such as an HVAC engineer.
Figure 9.7: Piping Method #2 - Direct Connection of Boiler to Heating System
nOTiCE
Where it is not possible to install a separate boiler loop, the system circulator must be sized to ensure that
the flow through the boiler stays within the defined parameters to prevent overheating when the boiler is
fired at it’s full rated input. Install a flow meter to measure the flow, or fire the boiler at full rate and ensure
the boiler delta T does not exceed 35°F (19°C).
IX. System Piping
(continued)
Содержание K2
Страница 10: ...10 105294 05 5 15 Figure 4 1 Minimum Clearances To Combustible Construction IV Locating the Boiler continued ...
Страница 12: ...12 105294 05 5 15 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued ...
Страница 37: ...37 105294 05 5 15 THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 69: ...69 105294 05 5 15 Figure 9 2 Piping Method 1 Near Boiler Piping Heating Only IX System Piping continued ...
Страница 74: ...74 105294 05 5 15 Figure 9 6 Piping Method 1 Near Boiler Piping Shaded Boiler Loop IX System Piping continued ...
Страница 84: ...84 105294 05 5 15 Figure 10 4 Proper Installation of Header Sensor X Wiring continued ...
Страница 86: ...86 105294 05 5 15 X Wiring continued ...
Страница 87: ...87 105294 05 5 15 Figure 10 6 Internal Wiring Connections Diagram X Wiring continued ...
Страница 89: ...89 105294 05 5 15 Figure 10 8 TACO SR504 or Equivalent Zone Panel Wiring Connection Diagram X Wiring continued ...
Страница 90: ...90 105294 05 5 15 X Wiring continued Figure 10 9 Sage Zone Control Circulator Panel Wiring Connection Diagram ...
Страница 97: ...97 105294 05 5 15 Lighting and Operating Instructions XI Start Up and Checkout continued ...
Страница 106: ...106 105294 05 5 15 ...
Страница 107: ...107 105294 05 5 15 ...
Страница 108: ...108 105294 05 5 15 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...