57
105294-05 - 5/15
VII. Venting
G. Assembly of Selkirk Polyflue Vent Systems
(continued)
6.
Installations using flexible Polyflue (Vent Options 35,36)
:
Warning
Asphyxiation Hazard. When using Polyflue flex, observe the following precautions:
• Polyflue flex may be damaged by handling at low temperatures. Do not bend, uncoil or attempt to
install if it has been stored at a temperature below 42°F without allowing it to warm to a higher
temperature first.
• Do not bend Polyflue flex more than 45°.
• Instructions below reference the Selkirk Polyflue instruction manual. Not all vent configurations shown
in the Selkirk vent manual are approved for use with this boiler.
Refer to Selkirk Polyflue Instructions for assembly of all flex components including the chimney cap and the adaptor to
rigid Polyflue at the base of the masonry or B vent chimney. In addition, observe the following requirements:
a. Refer to the appropriate Vent option in Table 7.21 for a list of the principle flex components required. Rigid vent pipe by
the same manufacturer will also be required for the run from the boiler to the base of the chimney.
b. Polyflue may not be used in air chase applications.
Figure 7.41: Polyflue Pipe Locking Band Installation
Содержание K2
Страница 10: ...10 105294 05 5 15 Figure 4 1 Minimum Clearances To Combustible Construction IV Locating the Boiler continued ...
Страница 12: ...12 105294 05 5 15 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued ...
Страница 37: ...37 105294 05 5 15 THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 69: ...69 105294 05 5 15 Figure 9 2 Piping Method 1 Near Boiler Piping Heating Only IX System Piping continued ...
Страница 74: ...74 105294 05 5 15 Figure 9 6 Piping Method 1 Near Boiler Piping Shaded Boiler Loop IX System Piping continued ...
Страница 84: ...84 105294 05 5 15 Figure 10 4 Proper Installation of Header Sensor X Wiring continued ...
Страница 86: ...86 105294 05 5 15 X Wiring continued ...
Страница 87: ...87 105294 05 5 15 Figure 10 6 Internal Wiring Connections Diagram X Wiring continued ...
Страница 89: ...89 105294 05 5 15 Figure 10 8 TACO SR504 or Equivalent Zone Panel Wiring Connection Diagram X Wiring continued ...
Страница 90: ...90 105294 05 5 15 X Wiring continued Figure 10 9 Sage Zone Control Circulator Panel Wiring Connection Diagram ...
Страница 97: ...97 105294 05 5 15 Lighting and Operating Instructions XI Start Up and Checkout continued ...
Страница 106: ...106 105294 05 5 15 ...
Страница 107: ...107 105294 05 5 15 ...
Страница 108: ...108 105294 05 5 15 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...