VII. Venting
H. Assembly of Centrotherm InnoFlue Vent Systems
6. Installations using InnoFlue Flex (Vent Options 20,21,37,38):
Warning
Asphyxiation Hazard. When using InnoFlue Flex, observe the following precautions:
• InnoFlue Flex may be damaged by handling at low temperatures. Do not bend, uncoil or attempt to
install if it has been stored at a temperature below 42°F without allowing it to warm to a higher
temperature first.
• Do not bend InnoFlue Flex more than 45°.
• Instructions below reference the Centrotherm InnoFlue instruction manual. Not all vent configurations
shown in the Centrotherm manual are approved for use with this boiler.
Refer to Centrotherm InnoFlue Instructions for assembly of all flex components including the chimney cap and the adaptor
to rigid InnoFlue at the base of the masonry or B vent chimney. In addition, observe the following requirements:
a. Refer to the appropriate Vent option in Tables 7.13b or 7.21 for a list of the principle flex components required. Rigid
vent pipe by the same manufacturer will also be required for the run from the boiler to the base of chimney.
b. Masonry chimneys cannot be used for an air chase
c. B vent chimneys can only be used for an air chase (Vent options 20, 21) if the B vent has the minimum size shown in
Table 7.13b and is fully accessible for sealing of all joints and seams.
d. When Vent Options 20, 21 are used, install a Tee of the same size at the base of the vent. Route the smooth section of
InnoFlue Flex (3”) or Flex Adaptor (2”) through a cap in the base of this Tee. Use a Centrotherm IAWP2P or IAWP03B
wall plate and RTV to seal this penetration. Install the Base Support using the Base support bracket as described in the
InnoFlue installation manual.
Connection of the PVC air intake pipe to the side outlet of the tee is made using a cap and a PVC socket x male thread
adaptor (2” or 3”, depending on the Vent Option). Cut a clearance hole in the cap for the male threads. Secure the adaptor
to the cap using a 2” or 3” electrical conduit lock nut. Seal all joints with RTV.
Содержание K2
Страница 10: ...10 105294 05 5 15 Figure 4 1 Minimum Clearances To Combustible Construction IV Locating the Boiler continued ...
Страница 12: ...12 105294 05 5 15 Figure 5 1 Wall Layout Mounting Hole Location V Mounting The Boiler continued ...
Страница 37: ...37 105294 05 5 15 THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 69: ...69 105294 05 5 15 Figure 9 2 Piping Method 1 Near Boiler Piping Heating Only IX System Piping continued ...
Страница 74: ...74 105294 05 5 15 Figure 9 6 Piping Method 1 Near Boiler Piping Shaded Boiler Loop IX System Piping continued ...
Страница 84: ...84 105294 05 5 15 Figure 10 4 Proper Installation of Header Sensor X Wiring continued ...
Страница 86: ...86 105294 05 5 15 X Wiring continued ...
Страница 87: ...87 105294 05 5 15 Figure 10 6 Internal Wiring Connections Diagram X Wiring continued ...
Страница 89: ...89 105294 05 5 15 Figure 10 8 TACO SR504 or Equivalent Zone Panel Wiring Connection Diagram X Wiring continued ...
Страница 90: ...90 105294 05 5 15 X Wiring continued Figure 10 9 Sage Zone Control Circulator Panel Wiring Connection Diagram ...
Страница 97: ...97 105294 05 5 15 Lighting and Operating Instructions XI Start Up and Checkout continued ...
Страница 106: ...106 105294 05 5 15 ...
Страница 107: ...107 105294 05 5 15 ...
Страница 108: ...108 105294 05 5 15 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net ...