Table of Contents
3-1-10
Page 3
Form No.
Pages
IV. DESIGN
4-1 – 4-14
Step No. 1 – Determine the Floor Area and Gross Volume of the Room
4-1
Step No. 2 – Determine the Minimum Number of Atomizers Required
4-1
Step No. 3 – Verify Atomizer Array Placement
4-2
Step No. 4 – Determine Location of System Supply
4-2
Step No. 5 – Sketch Pipe Routing
4-2
Water Calculation Procedure
4-3 – 4-4
Piping and Fitting Notes
4-3
Step No. 6 – Determine Total Atomizer Pressure (TAP)
4-5 – 4-7
Step No. 7 – Select Appropriate Atomizer Assembly
4-8
Step No. 8 – Determine Volume of Water Supply Required
4-8
Step No. 9 – Determine Number of Water Tanks Required
4-9
Step No. 10 – Determine Atomizer Pressure Loss
4-11 – 4-13
Step No. 11 – Determine Regulator Flowing Set Pressure
4-13
Step No. 12 – Select the Appropriate Regulator
4-13
Step No. 13 – Determine the Number of Nitrogen Cylinders
4-13
Step No. 14 – Complete Layout of the System
4-13
Step No. 15 – Create a Bill of Materials
4-13
Step No. 16 – Create Installation Drawings
4-14
V. INSTALLATION
5-1 – 5-14
General Information
5-1
Nitrogen Cylinder Installation
5-1 – 5-4
Bracketing Without Uprights – Double Row
5-2
Bracketing With Uprights – Back-To-Back
5-2
Bracket With Uprights – Double Row Back-To-Back
5-3
Water Tank Installation
5-4
Atomizer Installation
5-4
Releasing Devices
5-5
General Piping Requirements
5-5
Pipe Assembly
5-5
Hanger Requirements
5-5
Actuation Piping
5-5 – 5-6
Actuation Pipe, Tubing, and Fitting Requirements
5-5
Installation of Actuation Piping
5-6
High Pressure Manifold and Regulator
5-6 – 5-7
High Pressure Pipe and Fitting Requirements
5-6
Installation of High Pressure Manifold and Regulators
5-6 – 5-7
Discharge Piping (After Regulators)
5-7 – 5-10
System Piping, Tubing, and Fitting Requirements
5-7
Installation of Water Tank Pressurization Piping
5-8
Installation of Water Discharge Piping
5-8
Installation of Nitrogen Discharge Piping
5-9
Setting the Regulator
5-9 – 5-10
Содержание ANSUL AQUASONIC
Страница 84: ...SECTION V 3 1 2010 Page 5 14 NOTES Installation ...
Страница 88: ...SECTION VII 3 1 2010 Page 7 2 Inspection NOTES ...
Страница 94: ...SECTION VIII 3 1 2010 Page 8 6 NOTES Maintenance ...
Страница 116: ...APPENDIX C 3 1 2010 Page C 2 Main and Reserve Systems NOTES ...
Страница 134: ...APPENDIX D 3 1 2010 Page D 18 008567 Typical Examples ...
Страница 135: ...APPENDIX D 3 1 2010 Page D 19 008568 Typical Examples ...
Страница 136: ...APPENDIX D 3 1 2010 Page D 20 008569 Typical Examples ...
Страница 137: ...APPENDIX D 3 1 2010 Page D 21 008570 Typical Examples ...
Страница 138: ...APPENDIX D 3 1 2010 Page D 22 008571 Typical Examples ...
Страница 139: ...APPENDIX D 3 1 2010 Page D 23 008572 Typical Examples ...
Страница 140: ...APPENDIX D 3 1 2010 Page D 24 008573 Typical Examples ...
Страница 141: ...APPENDIX D 3 1 2010 Page D 25 008574 Typical Examples ...