Page 9 of 57
8
If the Vacuum Test is successful then select the B&D Test
cycle.
At this stage the chamber and steam generator will be
heating up. It will take approximately 15 minutes (from
selecting the B&D Test).
9
While waiting for the unit to heat up explain and instruct the
operator as follows (use the operation manual as reference):
9.1
Operation principals of the autoclave.
9.2
Preparation for sterilizing instruction including
loading instructions.
9.3
Intended use of each cycle.
9.4
Selecting a cycle.
9.5
Water filling method.
9.6
Displayed error and operational messages.
9.7
Monitoring and changing parameters.
9.8
Printer handling.
9.9
Maintenance instructions
10
Perform a B&D test with a chemical indicator.
11
The operator shall perform a cycle under supervision of the
technician.