![Turnigy PRM0282 Скачать руководство пользователя страница 51](http://html1.mh-extra.com/html/turnigy/prm0282/prm0282_user-manual_1182092051.webp)
3.1
<1>
Now that the printer is built we need to perform an operational check of the sensors and
motors and other components, then a Preprint setup.
51
First manually move the extrusion head to the approximate center of the print platform
(
picture 3.1a
). Then turn the Z axis lead screw by hand to lower the print platform to about
1 inch (or about 25mm) below the extrusion head (
picture 3.1b
).
Picture 3.1a
Picture 3.1b
Picture 3.1c
Now look over all the wiring, making sure nothing has been pinched or damaged during
assembly. Attach the A/C power cable to the left side port with the power switch in the
off position (
picture 3.1c
). Make sure the power plug matches to the type of receptacle
appropriate to your region, as well as double check that the main A/C power voltage was
set properly in the assembly process for 110 or 220 A/C input (Consult with a professional
if in doubt).
Turn off and lock-out system power before servicing.
Risk of electric shock or burn if failed to comply.
Plug in the power cable and turn on the main switch, the LCD will light up and after a few
seconds and provide a main screen readout. This main screen shows the temperature of
the heating bed, extruder and position of the gantry (
picture 3.1d
).
Picture 3.1d
Содержание PRM0282
Страница 1: ...User Guide 3D Printer 1...
Страница 60: ...PRM0282...