SECTION 2
2-18
INSTRUMENT CHECKOUT
AND MAINTENANCE
Fractional T1 (FT1) Option (107A-5)
If the Fractional T1 (FT1) Option is installed,
perform the following procedure to verify its operation.
1.
Test setup
Prepare the T-BERD 107A for testing in
accordance with the Instrument Checkout
Basic Setup procedure.
2.
MODE switch
Verify the FT1 D4, FT1 D1D, and FT1 ESF
modes are available.
3.
PATTERN switch
Press the
PATTERN
switch to verify the 63,
511, and 2047 patterns, as well as one of the
tones (404 Hz, 1004 Hz, 2804 Hz, or 2713
Hz) are available.
4.
AUX and PATTERN switch
Press the AUX switch to activate the
auxiliary functions. Press the PATTERN
switch to verify the AUX FT1 CHAN,
AUX FT1 IDLE, AUX FT1 RATE, and
AUX VF TONE functions are available.
AUX
MOVE
1/0
FT1 IDLE
▲
▲
▼
▼
IDLE CODE
1 0 1 0 1 0 1 1
MODE
PATTERN
CATEGORY
RESULTS
MODE
CATG
PATT
Содержание T-BERD 107A
Страница 81: ...SECTION 3 3 42 INSTRUMENT DESCRIPTION ...
Страница 203: ...6 20 SECTION 6 PRINTER OPERATION ...
Страница 239: ...C 18 STRESS PATTERNS APPENDIX C ...
Страница 249: ...INTELLIGENT APPENDIX D NETWORK EQUIPMENT D 10 ...
Страница 261: ...INDEX T BERD 107A INDEX 12 ...