FITTING THE SHOWER & CONTROLS
Offer the shower valve up to the fittings.
Check that the sealing washers are in place.
Screw the unions onto the fittings.
NOTE:
The mixer controls will need to be
fitted before commissioning can be carried
out.
Temperature Control
Fit the maximum temperature stop in the
orientation shown in
fig.8
.
To fit the temperature control (right hand side),
position the temperature graphic as close to the
12 o’clock position as possible. Once in place, fit
the retaining grub screw.
Flow Control
To fit the flow control (left hand side), the flow
control cartridge needs to be turned fully
clockwise until it stops
(fig.9)
NOTE:
The flow control graphic (styles of this
may vary) should be positioned so that it is at
the 12 o’clock position.
If fitted correctly, the graphic and flow control
should now be sitting in the designed OFF
position.
Once in place, fit the retaining grub screw.
Do not fit the levers until the commissioning
procedure has been carried out and the
temperature range checked.
LEAK TESTING
IMPORTANT:
Flush out the pipework in
accordance with Water Regulations and
Bylaws.
Fit the hose to the outlet, without the shower
head fitted, and direct it towards the waste
outlet.
Open the water isolating valves to the shower
and check for leaks.
If any leaks are found, rectify them before
carrying out the commissioning procedure.
Fig.8
Flat of the max
temp stop in
the 12 o’clock
position
Fit the collar to the
spindle, and
fasten using the
screw supplied
Fig.9
Turn the flow
control fully
clockwise
Fit the collar to the
spindle, and fasten
using the screw
supplied