11
• Route the cable into the shower unit for
connection to the terminal block
(fig.11)
as follows:
Earth
cable to terminal marked
Neutral
cable to terminal marked
N
Live
cable to terminal marked
L
•
Once the cables have been installed the two
trimplates will need to be fitted.
•
(fig.12)
shows a schematic wiring diagram.
IMPORTANT:
When connecting the cable fully
tighten the terminal block screws and make sure
that no cable insulation is trapped under the
screws. Loose connections can result in cable
overheating.
NOTE:
The supply cable earth conductor must
be sleeved. The outer sheath of the supply cable
must be stripped back to the minimum.
• The use of connections within the unit or
other points in the shower circuit to supply
power to other equipment i.e. extractor fans,
pumps etc. will invalidate the guarantee.
•
DO NOT
switch on the electricity supply
until the shower cover has been fitted.
7
Continued
SECTION
NOTE:
The elements on UK models are to
240V specification and will give a lower kW
rating if the voltage supply is below 240V.
Terminal block
L
Fig.11
N
E
Fig.12
L
N
E
1
2
3
5
7
6
inlet
outlet
9
9
4
8
1.
Terminal block
2.
Earth post
3.
Control PCB
4.
Power PCB
5.
Solenoid Valve
6.
Thermal cut-out
(main)
7.
Thermal cut-out
(outlet)
8.
Connector socket
9.
Element