R11 2x2
23
be started.
2.8.6.1.
Lubricate and install a new nozzle o-ring (96) in the nozzle (95)
groove.
2.8.6.2.
Set the nozzle (95) into the manifold (36) with the keyway at the top.
Evenly thread all four of the socket head capscrews (97) into the
threaded holes in the manifold (36). Evenly tighten the capscrews
until the nozzle is pulled into position. Then torque to 47 ft. lbs. (64
NM).
2.8.6.3.
Lubricate and install the pick-up tube o-ring (49) in the manifold (36).
2.8.6.4.
Clean the seal (75) face and the seal mating ring (78). Install
manifold puller into the manifold (36).
2.8.6.5.
Being extremely careful not to damage the seal (75) or the seal
mating ring (78), guide the pick-up tube through the manifold (36).
Remove the protective shield ad lower the manifold over the
manifold guide pins while holding the pick-up tube guide centered.
2.8.6.6.
Remove the manifold guide pins. Seat the manifold (36) to the
pedestal (17) by evenly threading the ten hex head capscrews (94).
Torque the capscrews to 72 ft. lbs. (98 NM).
2.8.6.7.
Remove the manifold puller. Using the pick-up tube guide, align the
manifold (36) keyway and the pick-up tube (1) keyway. Pull the
pick-up tube past the o-ring (49) and against the manifold shoulder.
rotating the driveshaft by hand may make it easier to pull up the pick-
up tube.
2.8.6.8.
Remove the pick-up tube guide. Install the pick-up tube key (82) into
the keyways. Using the lock nut tool, thread lock nut (81) into pick-
up tube. Torque lock nut to 217 ft. lbs. (294 NM).
2.8.6.9.
This completes the nozzle and nozzle o-ring replacement procedure
2.9. MAJOR COMPONENT REPLACEMENT
The following instructions are included in the event that the rotor, rotor cover or drive
shaft need replaced or other repairs are necessary. Refer to figure 2.4 as well as
section 6.0. Alternately, a stacked and balanced rotor assembly may be ordered
and installed by following the instruction of Section 2.7.5.14 to 2.7.5.15 and 2.7.6.12
to 2.7.6.36.
Caution
: Replacement of the rotor, rotor cover or driveshaft will require
balancing of the rotating assembly and shimming of the pump.
2.9.1. Disassembly
2.9.1.1.
Follow replacement instructions in Section 2.7 to 2.7.5.
Содержание Roto-Jet R11
Страница 1: ...Disassembly Assembly Manual R11 2x2 RJ DA 3 11 19 ...
Страница 9: ...R11 2x2 6 2 3 1 Model R11 Dimensional Drawing ...
Страница 29: ...R11 2x2 26 Figure 4 0 ...
Страница 33: ...R11 2x2 30 7 MAINTENANCE RECORD DATE SERIAL NO MAINTENANCE RECORD BY ...
Страница 34: ...R11 2x2 31 8 APPENDIX A When using the swivel hoist use in place of this lifting eye ...