22
7.1
Control panel start-up
Plug the cable into the control panel.
Switch on the control panel.
Once on, a few settings should get verified. The control panel will “beep” until the input of
the password.
Below is a guide to help with the settings:
Set important plant parameters during start-up. All of the three-line pop-up menus have the
same structure:
First line: Title (which parameter is being set?)
Second line: Current setting
Third line: New setting if required (select using arrow buttons)
Example:
The following parameters are requested in the following order, using the same logic:
Содержание Vitae UK6
Страница 1: ...1 206 Rev 3 Jan 2019 Tricel Vitae UK6 Wastewater Treatment Plants Engineering a green future...
Страница 37: ...37 NOTES This page is intentionally left blank...
Страница 38: ...38 NOTES This page is intentionally left blank...
Страница 39: ...39 NOTES This page is intentionally left blank...