5
1.3
Installation
•
Plan excavation work with due regard to health and safety requirements.
•
Excavated material should either be shored or battened back to a “safe” angle.
•
Use appropriate lifting equipment.
•
Take care around grounds work machinery.
•
Keep proper footing and balance at all time.
•
It is necessary to vent the Tricel Vitae at the inlet and the outlet of the plant.
Содержание Vitae UK6
Страница 1: ...1 206 Rev 3 Jan 2019 Tricel Vitae UK6 Wastewater Treatment Plants Engineering a green future...
Страница 37: ...37 NOTES This page is intentionally left blank...
Страница 38: ...38 NOTES This page is intentionally left blank...
Страница 39: ...39 NOTES This page is intentionally left blank...