![Tricel Vitae UK6 Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/tricel/vitae-uk6/vitae-uk6_technical-manual_1161210035.webp)
35
The Tricel Vitae wastewater treatment plants have successfully passed the stringent European
testing process and are approved to the new European standard EN 12566-3 Small wastewater
treatment plants for up to 12 PT-Part 3: Packaged and/or site assembled domestic wastewater
treatment plants. Tricel wastewater treatment plants were placed through a rigorous 38-week
test, by the certified laboratory PIA GmbH-Testing Institute for wastewater technology in
Aachen, Germany www.pia-gmbh.com.
The Tricel Vitae passed all structural testing (crush test & durability test) carried out by PIA
staff. Water tightness tests were performed by PIA at our headquarters on the range of tanks
up to P12 successfully passed all of the required tests.
Содержание Vitae UK6
Страница 1: ...1 206 Rev 3 Jan 2019 Tricel Vitae UK6 Wastewater Treatment Plants Engineering a green future...
Страница 37: ...37 NOTES This page is intentionally left blank...
Страница 38: ...38 NOTES This page is intentionally left blank...
Страница 39: ...39 NOTES This page is intentionally left blank...