VIII System Piping
A. General System Piping Precautions
TABLE 8.1: FLOW REQUIREMENTS THROUGH BOILER
BOILER MODEL MIN. REQUIRED FLOW AT
HIGH FIRE (GPM)
MAX. ALLOWABLE
FLOW (GPM)
T300
15
30
T399
20
45
T425
21
45
CAUTION
THE HEAT EXCHANGER USED IN THE TRIUMPH IS MADE FROM A SPECIAL ALUMINUM ALLOY.
FAILURE TO TAKE THE FOLLOWING PRECAUTIONS COULD RESULT IN SEVERE BOILER
DAMAGE.
•
BEFORE CONNECTING BOILER, MAKE SURE THAT THE SYSTEM IS FREE OF SEDIMENT,
FLUX AND ANY RESIDUAL BOILER WATER ADDITIVES. FLUSH THE SYSTEM IF
NECESSARY TO ENSURE THAT THESE CONTAMINATES ARE REMOVED.
• DO NOT CONNECT THIS BOILER TO A SYSTEM THAT IS SUBJECT TO REGULAR ADDITIONS
OF MAKEUP WATER OR ONE WHICH EMPLOYS RADIANT TUBING WITHOUT AN OXYGEN
BARRIER.
• DO NOT ADD
ANTIFREEZE OR OTHER BOILER WATER TREATMENT CHEMICALS EXCEPT
THOSE LISTED IN PART X OF THIS MANUAL.
• MAINTAIN THE PRESSURE IN THE BOILER AT A MINIMUM OF 12 PSI.
•
DESIGN SYSTEM TO ENSURE THAT THE FLOW FALLS WITHIN THE LIMITS CALLED FOR IN
TABLE 8.1.
•
THE BOILER IS FURNISHED WITH 2” GROOVED COUPLINGS. IF THE RUBBER SEAL IN
THESE COUPLINGS MUST BE REPLACED, USE ONLY COMPATIBLE GRADE EDPM (GREEN
COLOR CODE) REPLACEMENTS.
B. System Design
Proper operation of the TRIUMPH boiler requires that the water flow through the boiler remain within the limits shown
in Table 8.1. Failure to maintain the flow within these limits could result in erratic operation or premature boiler failure.
There are two basic methods that can be used to pipe the TRIUMPH boiler. Method #1 is almost always preferred. The
instructions on the following pages describe these methods for piping TRIUMPH boilers and explain how to size the circulator
and piping. Additional information on hydronic system design may be found in Installation of Residential Hydronic Systems
(Pub. #200) published by the Hydronics Institute in Berkeley Heights, NJ.
WARNING
INSTALL BOILER SO THAT THE GAS IGNITION SYSTEM COMPONENTS ARE PROTECTED
FROM WATER (DRIPPING, SPRAYING, RAIN, ETC) DURING APPLIANCE OPERATION AND
SERVICE (CIRCULATOR REPLACEMENT, ETC).
34
Содержание Triumph series
Страница 2: ......
Страница 31: ...29 FIGURE 6 21b CUTTING VERTICAL TERMINAL FIGURE 6 21c COMPLETING VERTICAL TERMINAL INSTALLATION ...
Страница 34: ...32 FIGURE 6 23 CONDENSATE PIPING ARRANGEMENT ...
Страница 48: ...46 Figure 8 14 Multiple Boiler Piping ...
Страница 50: ...Figure 9 1 Wiring Connections Diagram 48 ...
Страница 51: ...Figure 9 2 Ladder Diagram 49 ...
Страница 69: ...67 PAGE INTENTIONALLY LEFT BLANK ...
Страница 71: ...69 ...
Страница 72: ...70 ...
Страница 73: ...71 ...
Страница 75: ...73 ...
Страница 76: ...74 ...
Страница 78: ...76 ...
Страница 79: ...77 ...
Страница 82: ...80 ...
Страница 83: ...81 155 156 158 157 160 159 ...
Страница 84: ...82 161 162 164 163 166 165 ...
Страница 85: ...83 167 ...