22
5)
Assembly of Protech FasNSeal
a) FasNSeal General Notes:
• Do not cut 4” FasNSeal pipe. Consult FasNSeal instructions for method of cutting other 3” pipe.
• Orient FasNSeal vent components so the arrows on the piping labels are in the direction of flue gas flow.
• Support horizontal piping sections at intervals of 6 feet or less.
• Vertical venting systems must be supported by at least one FasNSeal support. An additional vertical support is
required after any offset.
b) Remove the hose clamp shipped on the TRIUMPH vent collar. Bend the three hose clamp tabs on this collar outward
slightly. Clean the exterior of the male end of the first piece of pipe and the inside of the vent collar on the boiler.
Remove dirt, grease, and moisture from the surfaces to be sealed. On the male end of the pipe, apply a ¼” wide bead
of high temperature silicone approximately 1/4 inch from the male end of the pipe. Insert the male end of the pipe into
the boiler vent collar until it bottoms out. Apply an additional bead of silicone over the outside of the joint and the seams
on the vent collar and smooth out (Fig 6.16). Replace and tighten the clamp on the vent collar.
c) All other joints in the FasNSeal venting system rely on a gasket in the female end of the pipe for a proper seal.
d) Align the longitudinal seam of both pipes. Insert the male end of the second pipe into the female end of the
first pipe until the bead on the male end contacts the flare on the female end.
e) Tighten the locking band with a nut driver.
f) Repeat (d) and (e) for the remaining FasNSeal components.
g) Allow the silicone to cure per the silicone manufacturer’s instructions before operating the boiler.
FIGURE 6.16: FASNSEAL CONNECTION TO VENT COLLAR
6)
Installation of Horizontal Exhaust Terminal
:
a) When stainless steel venting is used, use either Triad stainless exhaust terminal PN 240508 (4” vent systems) or PN 240509
(5” vent systems). The outer edge of this terminal must be within 12 inches of the surface of the wall.
The joint between the
terminal and the last piece of pipe must be outside of the building
.
b) Male end of terminal will fit into the female end of any of the approved stainless vent systems.
c) Apply a heavy bead of silicone to the male end of the terminal before inserting it into the last piece of pipe. Orient the terminal
so that the seam in the terminal is at 12:00.
d) Smooth the silicone over the seam between the terminal and the last piece of pipe, applying additional silicone if necessary to
ensure a tight seal.
e) Allow the silicone to cure per the silicone manufacturer’s instructions before operating the boiler.
7)
Installation of Vertical Exhaust Terminal - Use the terminal supplied by the vent system manufacturer shown in Table 6.4.
Attach to the vent system, following the assembly instructions in this manual for the stainless vent system being used.
Содержание Triumph series
Страница 2: ......
Страница 31: ...29 FIGURE 6 21b CUTTING VERTICAL TERMINAL FIGURE 6 21c COMPLETING VERTICAL TERMINAL INSTALLATION ...
Страница 34: ...32 FIGURE 6 23 CONDENSATE PIPING ARRANGEMENT ...
Страница 48: ...46 Figure 8 14 Multiple Boiler Piping ...
Страница 50: ...Figure 9 1 Wiring Connections Diagram 48 ...
Страница 51: ...Figure 9 2 Ladder Diagram 49 ...
Страница 69: ...67 PAGE INTENTIONALLY LEFT BLANK ...
Страница 71: ...69 ...
Страница 72: ...70 ...
Страница 73: ...71 ...
Страница 75: ...73 ...
Страница 76: ...74 ...
Страница 78: ...76 ...
Страница 79: ...77 ...
Страница 82: ...80 ...
Страница 83: ...81 155 156 158 157 160 159 ...
Страница 84: ...82 161 162 164 163 166 165 ...
Страница 85: ...83 167 ...