17
C
. Vent Adapter Installation
1) Stainless Vent Adapter Installation - The stainless vent adapter and air intake collar are shipped loose and
must be installed on the boiler before the vent system can be attached to the boiler. (see Fig. 6.11)
a) Place the orange silicone rubber gasket over the male end of the stainless vent adapter and line the hole
pattern up with the hole pattern on the flange of the stainless vent adapter.
b) Lubricate the blue gasket in the cast aluminum vent collar on the boiler’s sump with a few drops of water.
c)Insert the male end of the vent adapter into the sump of the boiler and push it in until the flange of the vent
adapter is flush with the rear jacket panel.
d)Attach the vent adapter to the rear jacket panel with the (6) 1/4-20 self tapping screws supplied with the
boiler.
e) Connect the loose end of the 1/2” clear plastic tubing connected to the condensate trap to the connection on
the bottom of the adapter. Secure with the hose clamp provided.
f) Install the air intake collar on the rear of the boiler using the four 1/4-20 self tapping screws provided.
2) Concentric Vent Adapter Kit Installation - The concentric vent adapter kit includes:
a) Start assembly of the Concentric Vent Adapter Kit by attaching the rubber gasket and concentric vent adapter
to the vent opening found on the rear jacket panel with (4) 1/4-20 x 1/2” self tapping screws. (See Fig. 6.12)
b) Insert the 100mm polypropylene vent stub through the concentric vent adapter and into the vent
connection cast on the sump of the boiler until it bottoms out.
c) Insert the 100/150 concentric condensate collector into the 100mm polypropylene vent stub and the
concentric vent adapter until the bead on the collector bottoms out on the concentric vent adapter. Turn
the condensate collector so that the threaded stub faces the floor. Attach the condensate collector to the
concentric vent adapter with (3) #10 x 1/2” sheet metal screws in the holes provided on the concentric vent
adapter.
d) Apply pipe thread sealant tape (not supplied) to the straight hose barb fitting and attach it to the condensate
collector drain adapter.
e) Attach the condensate collector drain adapter to the threaded stub sticking out the bottom of the concentric
condensate collector.
f) Connect the loose end of the 1/2” clear plastic tubing connected to the condensate trap to the connection on
the bottom of the adapter. Secure with the hose clamp provided.
g) Install the cover plate shown in Figure 6.12 on the rear of the boiler using the 1/4-20 self tapping screws
provided.
P/N 230556
(T300)
Description
240491
Concentric Vent Adapter
90-212
#10 x 1/2” Sheet Metal Screws (3)
240507
100mm Polypropylene Vent Stub
230575
100/150mm Concentric Condensate Collector
240552
Condensate Collector Drain Adapter
240556
Straight Hose Barb
240495
4” Air Inlet Cover
900100
1/4-20 x 1/2 Self Tapping Screw (8)
Содержание Triumph series
Страница 2: ......
Страница 31: ...29 FIGURE 6 21b CUTTING VERTICAL TERMINAL FIGURE 6 21c COMPLETING VERTICAL TERMINAL INSTALLATION ...
Страница 34: ...32 FIGURE 6 23 CONDENSATE PIPING ARRANGEMENT ...
Страница 48: ...46 Figure 8 14 Multiple Boiler Piping ...
Страница 50: ...Figure 9 1 Wiring Connections Diagram 48 ...
Страница 51: ...Figure 9 2 Ladder Diagram 49 ...
Страница 69: ...67 PAGE INTENTIONALLY LEFT BLANK ...
Страница 71: ...69 ...
Страница 72: ...70 ...
Страница 73: ...71 ...
Страница 75: ...73 ...
Страница 76: ...74 ...
Страница 78: ...76 ...
Страница 79: ...77 ...
Страница 82: ...80 ...
Страница 83: ...81 155 156 158 157 160 159 ...
Страница 84: ...82 161 162 164 163 166 165 ...
Страница 85: ...83 167 ...