STE 73995
– 2 –
TRANSPORTATION AND INSTALLATION MANUAL
Preface
This manual describes how to unpack and install the industrial robot and controller.
Specifically, it describes how to unpack the shipment containing the equipment, how to
install the equipment, how to connect wiring and air piping, and how to attach tools. Be
sure to look through this manual before unpacking the shipment.
Before beginning the work according to this manual, read through the Startup Manual and
Safety Manual so that you can learn the names and functions of various components and
the safety measures.
This manual is divided into the following four (4) sections:
Section 1 Transportation
This section describes how to remove the robot and controller from their
boxes and how to transport them to the installation site. This section also
discusses how to temporarily store the equipment after unpacking the
shipment.
Section 2 Installation
This section discusses the equipment installation environment, space
requirements, and how to install the equipment.
Section 3 System Connections
This section describes how to connect the robot, controller and peripheral
equipment.
Section 4 Tool Interlace
This section describes how to connect the tool to the robot arm and how to
connect pipes and wires to the tool. This section also discusses maximum
permissible loads of the tool.
Содержание TH180
Страница 10: ...STE 73995 9 TRANSPORTATION AND INSTALLATION MANUAL Fig 1 1 Robot package TH250A Fig 1 2 Robot package TH350A ...
Страница 11: ...STE 73995 10 TRANSPORTATION AND INSTALLATION MANUAL Fig 1 3 Robot package TH180 ...
Страница 21: ...STE 73995 20 TRANSPORTATION AND INSTALLATION MANUAL Fig 2 4 External view of TH350A T robot ...
Страница 43: ...STE 73995 42 TRANSPORTATION AND INSTALLATION MANUAL Fig 3 4 Robot side connector arrangement TH350A T ...
Страница 80: ...STE 73995 79 TRANSPORTATION AND INSTALLATION MANUAL APPROVED BY CHECKED BY PREPARED BY ...