f. Parallel the battery cabinets by using the provided cables to connect the next battery cabinet in line. Bolt the
terminal lugs to the bus stubs. Ensure polarity continuity is maintained. Battery Cabinet A to Battery Cabinet B to
Battery Cabinet C.
g. The cables from Battery Cabinet A to UPS require the lugs to be removed for the DC terminal block on the UPS.
h.
Once all cables are bolted to the circuit breaker bus stubs, install the Plexiglas safety shield by screwing the long
thin lip of the shield to the inside of the frame upright with two screws as shown in
i.
Use the existing screws in the location shown in
Figure 9.11. Remove the screws, position the safety shield, and
reinstall the screws.
j.
Ensure that all connections electrically made according to
Содержание 4400 Series
Страница 2: ......
Страница 6: ...This page left intentionally blank ...
Страница 10: ...This page left intentionally blank ...
Страница 114: ...104 4400 Series Installation and Operation Manual 64527 008 This Page Intentionally Left Blank ...
Страница 117: ...107 4400 Series Installation and Operation Manual 64527 008 FIGURE A 3 4400 50 KVA PHYSICAL DIMENSIONS 1 2 ...
Страница 118: ...108 4400 Series Installation and Operation Manual 64527 008 FIGURE A 4 4400 50 KVA PHYSICAL DIMENSIONS 2 2 ...
Страница 119: ...109 4400 Series Installation and Operation Manual 64527 008 FIGURE A 5 4400 80 KVA PHYSICAL DIMENSIONS ...
Страница 120: ...110 4400 Series Installation and Operation Manual 64527 008 FIGURE A 6 4400 100 KVA PHYSICAL DIMENSIONS ...
Страница 136: ...This page left intentionally blank ...
Страница 137: ......