45
4400 Series Installation and Operation Manual – 64527-008
FIGURE 9.7:
REMOVE INSTALLED LUGS
FIGURE 9.8:
INSERT NUT KEEP
3.
Install the Bus Stubs
a.
Thread a standoff insulator onto one of the two pem studs to the right of the breaker and tighten finger tight. (
b.
Thread the remaining standoff insulator on the remaining pem stud. (Figure 9.9-B)
c.
Insert a bus stub into the circuit breaker’s upper nut keep. Secure it with the ¼” x 20 cap screw. (Figure 9.10)
d.
Secure the bus stub to the standoff insulator with a ¼”x20 ½ in. Sems bolt. (Figure 9.10)
e.
Repeat Steps c & d for the remaining bus stub.
Содержание 4400 Series
Страница 2: ......
Страница 6: ...This page left intentionally blank ...
Страница 10: ...This page left intentionally blank ...
Страница 114: ...104 4400 Series Installation and Operation Manual 64527 008 This Page Intentionally Left Blank ...
Страница 117: ...107 4400 Series Installation and Operation Manual 64527 008 FIGURE A 3 4400 50 KVA PHYSICAL DIMENSIONS 1 2 ...
Страница 118: ...108 4400 Series Installation and Operation Manual 64527 008 FIGURE A 4 4400 50 KVA PHYSICAL DIMENSIONS 2 2 ...
Страница 119: ...109 4400 Series Installation and Operation Manual 64527 008 FIGURE A 5 4400 80 KVA PHYSICAL DIMENSIONS ...
Страница 120: ...110 4400 Series Installation and Operation Manual 64527 008 FIGURE A 6 4400 100 KVA PHYSICAL DIMENSIONS ...
Страница 136: ...This page left intentionally blank ...
Страница 137: ......