
Aluminum Spindle Rebuild
Aluminum Spindle Disassembly
g352924
Figure 67
1.
Hex Nut
6.
Bottom Guard
2.
Washer
7.
Spindle Shaft
3.
Blade Drive Sheave
8.
Blade
4.
Top Bearing Guard
9.
Hex Bushing
5.
Spindle Asm
10.
Screw
1. Park the machine on a level surface, disengage the PTO and set the parking
brake. Stop the engine, wait for all moving parts to stop and remove the key.
2. Remove the deck belt.
Deck Belt Replacement (page 6–4)
3.
Remove the ½ inch bolt securing the blade and blade driver to the spindle
shaft.
4. Remove the ¾ inch lock nut securing the pulley to the spindle shaft. Once the
pulley is removed, the spindle shaft can be lowered from the spindle housing.
Note:
View the orientation of the top and bottom bearing guards when
removing the spindle shaft.
4000 Series Z MASTER® Service Manual
Page 6–11
Deck: Service and Repairs
3442-427 Rev A
Содержание Z Master 4000 Series
Страница 2: ...Revision History Revision History Page 2 4000 Series Z MASTER Service Manual 3442 427 Rev A...
Страница 6: ...Preface Page 6 4000 Series Z MASTER Service Manual 3442 427 Rev A...
Страница 30: ...Troubleshooting General Troubleshooting Page 3 6 4000 Series Z MASTER Service Manual 3442 427 Rev A...
Страница 108: ...Electrical Service and Repairs Page 8 14 4000 Series Z MASTER Service Manual 3442 427 Rev A...
Страница 111: ...Drawing Rev A Sheet 1 3442 427 Rev A Page A 3 Electrical Schematic g342795...
Страница 112: ...Page A 4 3442 427 Rev A Drawing Rev Sheet Electrical PTO Engaged Schematic g346038...
Страница 113: ...Drawing Rev Sheet 3442 427 Rev A Page A 5 Electrical Run Position g346039...
Страница 114: ...Page A 6 3442 427 Rev A Drawing Rev Sheet Electrical Start Position g346040...