Right Console Removal (continued)
9. Disconnect the wiring harness from the PTO switch.
g346222
Figure 25
10. Pinch together the 2 tabs on the PTO switch. Pushing from the bottom side
up, remove the PTO switch from the RH side pod.
11. Pinch together the 2 tabs on the ignition switch. Pushing from the bottom
side up, remove the ignition switch from the RH side pod.
12. Remove the 2 (5/16 inch) lock nuts and carriage bolts securing the RH
console to the chassis.
13. Lift the RH console away from the machine.
Right Console Installation
1. Install the RH console onto the machine.
2. Install the 2 (5/16 inch) lock nuts and carriage bolts securing the RH console
to the chassis.
3. Install the ignition switch to the RH side pod.
4. Install the PTO switch to the RH side pod.
5. Connect the wiring harness to the PTO switch.
g346222
Figure 26
Chassis: Service and Repairs
Page 5–12
4000 Series Z MASTER® Service Manual
3442-427 Rev A
Содержание Z Master 4000 Series
Страница 2: ...Revision History Revision History Page 2 4000 Series Z MASTER Service Manual 3442 427 Rev A...
Страница 6: ...Preface Page 6 4000 Series Z MASTER Service Manual 3442 427 Rev A...
Страница 30: ...Troubleshooting General Troubleshooting Page 3 6 4000 Series Z MASTER Service Manual 3442 427 Rev A...
Страница 108: ...Electrical Service and Repairs Page 8 14 4000 Series Z MASTER Service Manual 3442 427 Rev A...
Страница 111: ...Drawing Rev A Sheet 1 3442 427 Rev A Page A 3 Electrical Schematic g342795...
Страница 112: ...Page A 4 3442 427 Rev A Drawing Rev Sheet Electrical PTO Engaged Schematic g346038...
Страница 113: ...Drawing Rev Sheet 3442 427 Rev A Page A 5 Electrical Run Position g346039...
Страница 114: ...Page A 6 3442 427 Rev A Drawing Rev Sheet Electrical Start Position g346040...