g192867
g192944
Figure 47
1.
Left spray-section switch
3.
Right spray-section switch
2.
Center spray-section
switch
4.
Master section switch
2.
Press button 2 to advance to the next step
(
).
3.
At the Repeat the Following Test screen, press
button 2 to start the sprayer section catch test
(
).
g192945
Figure 48
Performing the Sprayer Section Catch Test
Note:
Ready the graduated catch container.
1.
Set the master section switch to the O
N
position
(
).
2.
Use the application-rate switch to adjust the
sprayer system pressure to approximately 276
kPa (40 psi); refer to
g192699
Figure 49
1.
Pressure gauge (sprayer
system)
2.
Application-rate switch
3.
Set the master section switch to the O
FF
position
(
).
4.
At the catch test playback screen, confirm the
number of booms, the nozzle color, and press
button 3 to start the catch test (
Note:
You have 14 seconds to move to the
back of the machine and position the graduated
catch container under a spray nozzle for the
catch test period.
18