g346659
Figure 35
1.
Lower screw
3.
Upper left screw
2.
Upper right screw
4.
Adjust the screws on both sides evenly till the
distance between the marks has increased to an
initial dimension of 1004 mm (39-1/2 inch).
Note:
Make the adjustments evenly on both
sides in small steps.
5.
Run the conveyor belt only slowly to detect any
belt movement and before any damage occurs.
6.
If the belt keeps slipping, adjust the screws
evenly till a maximum of 1010 mm (39-13/16
inch).
7.
If the conveyor belt tends to move to the left, give
a little more tension on the lower left adjustment.
If the conveyor belt moves to the right, give a
little more tension to the lower right adjustment.
Note:
Carry out the adjustments in small steps.
Belt Tensioning
Belt movement
The belt moves to
the left.
The belt moves to
the right.
Adjustment
Tighten the lower
left screw.
Tighten the lower
right screw.
8.
After each adjustment, allow the conveyor belt
to rotate for at least 10 rotations to position itself
to the new alignment before making any further
corrections.
9.
If the belt is working properly again, securely
lock the screws in place.
Cleaning the Machine
Service Interval:
After each use
Important:
Do not use brackish or reclaimed
water to clean the machine.
•
After daily use, thoroughly wash the machine
with a garden hose (
without
a nozzle) to avoid
contamination and seal and bearing damage due
to excessive water pressure.
Note:
Use a brush to help remove thick layered,
dried, or compacted dirt and debris.
•
Use a mild detergent to clean the covers.
•
Inspect the machine for damage, leaking oil, and
component wear.
•
After cleaning the machine, grease all drive
lines and roller bearings; refer to
Attachment (page 22)
.
26
Содержание 46452
Страница 7: ...g357840 Figure 3 1 Lifting point 2 Rear roller g348382 Figure 4 1 Lifting point 7...
Страница 21: ...g347982 Figure 27 1 Hairpin cotter 3 2 Hitch pin 3 21...
Страница 33: ...Notes...
Страница 34: ...Notes...