![Topcon ISOBUS Artemis Скачать руководство пользователя страница 26](http://html.mh-extra.com/html/topcon/isobus-artemis/isobus-artemis_operation-manual_1128515026.webp)
ISOBUS ARTEMIS - SEED DRILL CONTROLLER
24
23
B.M.2
Wrong number of
blockage sensors is
detected
▪
The correct number of sensors is
programmed in blockage ECU setup
▪
All sensors are wired correctly and
connected
24
B.M.3
Blocked sensor/row
▪
Row or pipe is actually blocked
25
B.M.4
Communication break
between
blockage
sensors
▪
Wiring between blockage sensors
▪
The correct number of sensors is
programmed
26
E.H.1
Electro hydraulic
module offline
▪
Check wiring between 4way
superseal and connection to the
main loom.
Issue Ref.
Date
Notes
A
14.10.16
1st Draft : Derived from UK805200
B
1.3.17
2
nd
draft : re-formatted
B
23.3.17 3
nd
draft : (Section 1 added note)
Содержание ISOBUS Artemis
Страница 1: ...859 UK ISOBUS Artemis Seed Drill Controller Calibration and Operation Manual ...
Страница 2: ......
Страница 27: ......