![Topcon ISOBUS Artemis Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/topcon/isobus-artemis/isobus-artemis_operation-manual_1128515025.webp)
ISOBUS ARTEMIS - SEED DRILL CONTROLLER
23
16
M.2.H
Motor speed high
Error between actual
motor speed and target
motor speed is greater
than 10%
▪
Target motor speed to high
▪
Erratic forward speed signal
▪
Erratic loading on motor via metering
unit
17
M.3
Metering unit is not
going around
▪
Is metering unit rotating when motor
rotates
▪
Sensor & target functioning and
correct
▪
PPR value programmed correctly
Wiring between sensor and
connection box is correct
▪
Wiring between connection box and
CAN module is correct
18
-
-
-
19
H.1
Tramline module is
‘offline’
▪
Check module has got power from
main battery power cable
▪
Check wiring between 4way
connector and module connector on
HBM harness
No.
Code
Screen
Reason
Check?
20
G.1
GPS signal lost.
▪
Check connections to GPS antenna.
▪
Check GPS coverage for Area
21
B.1
Bridge Module is
‘offline’
22
B.M.1
Blockage monitoring
ECU is ‘offline’
▪
Check power supply to blockage
ECU
▪
Check wiring between power harness
and blockage ECU
▪
Check LEDs are lit and flashing on
blockage ECU
Содержание ISOBUS Artemis
Страница 1: ...859 UK ISOBUS Artemis Seed Drill Controller Calibration and Operation Manual ...
Страница 2: ......
Страница 27: ......