172-65702M-04 (SQ-C01) 10 Dec 2020
13
Installation Check List
Item
Description
✓
Before
commissioning
The unit and its
surroundings
Have all packed items been included?
Has the unit been installed in
accordance with the procedures
packed with the product?
Have all five connection ports been
connected correctly?
Has the unit been installed securely
and stably? Has sufficient space
required for inspection and repair
been provided?
Have all the necessary parts and
piping been connected?
Have bolts and plugs been securely
tightened?
Have piping supports been firmly
installed?
Are the supply conditions for steam
and water appropriate?
Has piping in the unit been
additionally tightened after
installation?
After
commissioning
Initial blowdown
Has initial blowdown been conducted?
Commissioning
Has the water temperature stabilized
after start-up?
Fluid Leakage
Are there any leaks from any area of
the unit?
Abnormal
sounds/vibrations
Does the unit vibrate, or is there a
sound of 80 dB or more?
Preventative
measures against
freezing
Have any measures been taken for
prevention of damage due to freezing
if the unit is not used for a long period
of time?
Explanation to the
customer
Have instructions for safe use been
provided to the customer?