background image

Contents

1  About  this  Manual........................................................................................................................5

1.1  Symbols  Used....................................................................................................................................... 5
1.2  Storing  the  Manual................................................................................................................................ 5
1.3  Limitations  of  the  Document................................................................................................................. 5
1.4  Terms  and  Abbreviations...................................................................................................................... 6
1.5  Trademarks............................................................................................................................................6
1.6  Liability  and  Warranty............................................................................................................................6
1.7  Manufacturer  Details............................................................................................................................. 7
1.8  Document  Information........................................................................................................................... 7

2  Safety.............................................................................................................................................8

2.1  Qualified  Personnel............................................................................................................................... 8
2.2  Intended  Use......................................................................................................................................... 8
2.3  General  Safety  Rules............................................................................................................................ 9
2.4  Electrical  Hazards................................................................................................................................10
2.5  Transport  and  Storage........................................................................................................................ 10
2.6  Lifting  and  Carrying............................................................................................................................. 11
2.7  Installation  and  Maintenance...............................................................................................................11

3  About  the  Product......................................................................................................................12

3.1  About  CEDD

®

......................................................................................................................................12

3.2 About the CEDD

®

 HPS Basestation................................................................................................... 12

3.2.1 Position in the CEDD

®

 AGL System.......................................................................................... 12

3.2.2  Dimensions.................................................................................................................................. 13
3.2.3 CEDD

®

 HPS Basestation: Components..................................................................................... 14

3.3  Specifications.......................................................................................................................................14

4  Inspection....................................................................................................................................15

4.1  Inspect  the  Transport  Box...................................................................................................................15
4.2 Inspect the Contents of the Transport Box......................................................................................... 15
4.3 Visually Inspect the CEDD

®

 HPS Basestation................................................................................... 15

5  Installation...................................................................................................................................16

5.1  Installation  Safety................................................................................................................................ 16
5.2  Installation  Requirements.................................................................................................................... 17

5.2.1  Location  Requirements............................................................................................................... 17
5.2.2  Acclimatization.............................................................................................................................17
5.2.3  Power  Supply  Requirements...................................................................................................... 18
5.2.4  Mounting  Requirements.............................................................................................................. 18

5.3  Installation  Instructions........................................................................................................................ 20

5.3.1  Wall-mounting  Instructions.......................................................................................................... 20
5.3.2  Connecting  Instructions...............................................................................................................22

6 Operation and Commissioning.................................................................................................26

7  Maintenance................................................................................................................................ 27

7.1  Maintenance  Safety............................................................................................................................. 27
7.2  Preventive  Maintenance...................................................................................................................... 27

Installation and Maintenance Manual  -  CEDD

®

 HPS Basestation

©

TKH Airport Solutions 2022. All rights reserved. All specifications subject to change without notice.

3

Содержание CEDD

Страница 1: ...HPS Basestation Installation and Maintenance Manual CEDD AGL System Airfield Ground Lighting 03 70092 V2 0...

Страница 2: ...or USE System Engineering Holding B V or their affiliated companies include the following The specified product information herein and all related data and information are proprietary and confidential...

Страница 3: ...13 3 2 3 CEDD HPS Basestation Components 14 3 3 Specifications 14 4 Inspection 15 4 1 Inspect the Transport Box 15 4 2 Inspect the Contents of the Transport Box 15 4 3 Visually Inspect the CEDD HPS Ba...

Страница 4: ...placing a CEDD HPS Basestation 28 8 Troubleshooting 32 9 Taking Out of Service 33 9 1 Disposal 33 4 Installation and Maintenance Manual CEDD HPS Basestation TKH Airport Solutions 2022 All rights reser...

Страница 5: ...nce Manual is a part of your product Store the manual in a location that can be easily accessed by personnel working on the product It is the responsibility of the company operating this equipment to...

Страница 6: ...tions and safety guidelines in this manual The safety of any system incorporating the HPS Basestation is the responsibility of any site installation commissioning maintenance and operational personnel...

Страница 7: ...rport Solutions Customer Service department service tkh airportsolutions com 1 8 Document Information Name 05_CEDD_HPS_Basestation_Installation_and_Maintenance_Manual_03 70092 Version V2 0 Language En...

Страница 8: ...alling operating or maintaining this equipment to ensure that its personnel meet these requirements 2 2 Intended Use The CEDD HPS Basestation is designed and intended only for the purpose of Airfield...

Страница 9: ...ing of system components and their operation will help you to operate the system safetly and efficiently Do not deactivate or bypass automatic safety interlocks or locked out electrical disconnects Pr...

Страница 10: ...products Verify that the moving equipment is rated to handle the weight When loading or unloading ensure that the products are carefully balanced and secured using a safety strap No more than 6 packag...

Страница 11: ...lose to your body while moving Keep the CEDD HPS Basestation at a reasonable height so you can see where you are going 2 7 Installation and Maintenance Read the safety instructions in Chapter 5 Instal...

Страница 12: ...es and the fixtures send information about their status back to the CEDD HPS Basestation Each fixture is connected to the CEDD cable without galvanic contact HPS means High Power System The CEDD HPS B...

Страница 13: ...s Outer dimensions Pos Description Values 1 Width 480 mm 2 Height 545 mm 3 Depth 193 mm 4 Horizontal screw hole distance 430 mm 5 Vertical screw hole distance 500 mm Installation and Maintenance Manua...

Страница 14: ...in Logic AC mains in 3 LAN 4 CEDD Power out Make sure the labels are always legible Replace labels if they are damaged or illegible 3 3 Specifications Refer to the datasheet to read the specification...

Страница 15: ...ning W rth Logic mains in connector 691340400003 Phoenix Contact Power AC mains in connector PC 5 3 GF 7 62 Art No 1720806 Weidm ller CEDD power out connector 1813580000 3 pin A zip bag containing Saf...

Страница 16: ...itions Allow ample room for maintenance panel accessibility and cover removal Protect equipment with safety devices as specified by applicable safety regulations If safety devices must be removed for...

Страница 17: ...re that the CEDD HPS Basestation is properly connected to the protective earth before connecting mains power The CEDD HPS Basestation is a system with a high touch current It is highly recommended to...

Страница 18: ...kers must have a nominal current of 16 A and be type B according to IEC 60898 The use of a disconnecting device is mandatory This device has to simultaneously switch and isolate the Power AC mains in...

Страница 19: ...l constructive profiles leaving the space minimum 80 mm between the cabinet and the wall at the top and bottom open for airflow The cabinet should not be mounted on horizontal profiles which would red...

Страница 20: ...needed Open ended wrench 10 mm Metric tap set 6 mm Drill with drill bit 5 mm The example below is a guide to mounting the CEDD HPS Basestation on a metal structure Other support structures may require...

Страница 21: ...moothly onto the lower bolts 5 Place the upper mounting slots over the highest bolts and carefully lower the CEDD HPS Basestation onto the four bolts 6 Fasten the four supporting bolts use a wrench to...

Страница 22: ...aterials necessary to connect the Protective Earth to the CEDD HPS Basestation are not included in the connector kit The following tools are needed Phillips PH2 screwdriver Pozidriv PZ2 screwdriver sl...

Страница 23: ...cabinet to the protective earth using an M4 7 mm hex socket tightened to 2 Nm with a ratcheting socket wrench or equivalent 1 M4 serrated lock washer 2 M4 ring tongue terminal with earth cable 4 mm 2...

Страница 24: ...Plug in and hand tighten the Power AC mains in A and Logic AC mains in B connectors to the CEDD HPS Basestation Tighten the 2 connector flange screws using a slotted SL3 screwdriver Do not plug anyth...

Страница 25: ...CEDD HPS Basestation to lock the cable connector 8 Remount the bottom panel Attach the protective earth wire 1 and mount the bottom panel by fastening the two screws at the front 2 using a Phillips P...

Страница 26: ...D AGL LED fixtures cannot be controlled directly after installation In order to work properly the CEDD HPS Basestation must first be configured The configuration can be installed locally on 1 CEDD HPS...

Страница 27: ...fluid be allowed to enter the CEDD HPS Basestation To clean the outside of the CEDD HPS Basestation 1 Remove any dirt on the cabinet with a soft moist cloth If necessary add a mild detergent water an...

Страница 28: ...are needed Phillips PH2 screwdriver Slotted SL3 screwdriver Ratcheting socket wrench or equivalent with M4 7 mm hex socket Open ended wrench 10 mm Perform the following steps to replace a CEDD HPS Ba...

Страница 29: ...onnector from the CEDD HPS Basestation Power AC Mains In Logic AC Mains In LAN1 LAN2 CEDD Power out 5 Disconnect the protective earth of the cabinet using an M4 7 mm hex socket with a ratcheting socke...

Страница 30: ...3 M4 plain washer 4 M4 self locking nut 8 Remount the bottom panel by fastening two screws at the front using a Philips PH2 screwdriver 9 Slide the CEDD HPS Basestation upwards and carefully pull the...

Страница 31: ...t to TKH Airport Solutions If the original packaging is not available please contact TKH Airport Solutions Customer Service for instructions 12 If you need to install a new CEDD HPS Basestation go to...

Страница 32: ...e front panel display is illuminated If not refer to failure 1 If illuminated check whether the cooling fans are running wait 30 seconds after turning on the device Make sure that the Power AC mains a...

Страница 33: ...r or disposal Contact TKH Airport Solutions Customer Service for the correct address 9 1 Disposal All electrical and electronic products must be disposed of separately from normal waste at the end of...

Страница 34: ...on of pioneering developments in the AGL and connectivity industry Being part of the TKH Group our company can build on a history of more than 90 years in smart connectivity energy distribution and AG...

Отзывы: