4 Inspection
Before installation, the transport box and CEDD
®
HPS Basestation must be inspected for damage and
defects.
4.1 Inspect the Transport Box
If the transport box appears to be damaged, keep the transport box and cushioning material until the
contents of the box have been checked for completeness, and the CEDD
®
HPS Basestation has been
checked mechanically and electrically.
If the CEDD
®
HPS Basestation has been damaged during transport, put the product
and all other parts back into the transport box and contact your shipper and carrier.
4.2 Inspect the Contents of the Transport Box
Do not open the sealed bag containing the CEDD
®
HPS Basestation yet.
The transport box must contain the following items:
•
A sealed bag containing:
•
CEDD
®
HPS Basestation
•
Silica gel pouch
•
CEDD
®
HPS Basestation Connector kit containing:
•
Würth Logic mains in connector 691340400003
•
Phoenix Contact Power AC mains in connector PC 5/ 3-GF-7,62 (Art. No.: 1720806)
•
Weidmüller CEDD
®
power out connector 1813580000 (3 pin)
•
A zip-bag containing:
•
Safety instruction sheet 03-70093
•
CEDD
®
HPS Basestation Installation and Maintenance Manual 03-70092 (this manual)
•
Factory Acceptance Test Report 03-70100
Inspect the contents of the transport box. If any item is missing, contact TKH Airport Solutions Customer
Service [email protected].
4.3 Visually Inspect the CEDD
®
HPS Basestation
Follow the acclimatization procedure before opening the sealed bag of the CEDD
®
HPS
Basestation. See Acclimatization on page 17
Unpack and inspect the CEDD
®
HPS Basestation and accessories. If there is any mechanical damage or
defect, contact TKH Airport Solutions Customer Service [email protected] .
Installation and Maintenance Manual - CEDD
®
HPS Basestation
©
TKH Airport Solutions 2022. All rights reserved. All specifications subject to change without notice.
15