TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL
- Plug the power cord of the pellet auger into the
indicated Schuko-type boiler socket on the left side
of the boiler housing.
Diagram 6. Pellet burner Pell and Fuel
Hopper FH connected to Pellet boiler
PelleBurn /see page 60/
1. Pellet boiler PelleBurn;
2. Pellet burner Pell;
3. Auger hose;
4. Auger;
5. Fuel Hopper FH.
7.3. Connecting the boiler to the mains power
supply
Such connection must be performed by a
technician / service shop authorized for
such operations.
Caution! ELECTRIC SHOCK HAZARD!
- Before opening the unit: switch off the
voltage and secure the unit against
accidental restart.
- Observe installation instructions.
Improper cable connections may damage
the regulator!
The device may be damaged if struck by
a lightning. Make sure it is unplugged
during the storms.
It is mandatory to assure a backup power
generator of corresponding rated power!
(see table 1)
To bring into exploitation the boiler and auger must
be connected to the electricity network 220V/50Hz
with power cord. Create tight connection with
the electrical mains which complies with the local
regulations.
Diagram 7. Wiring diagram of connection
of boiler elements to the controller
/see page 61/
Diagram 8. Wiring diagram of connection
of burner elements to the controller
and connecting socket /see page 62-63/
7.4. Connecting the boiler to the heating
installation.
Such connection must be performed by a
technician / service shop authorized for
such operations.
When the boiler is connected to a heating system,
it is mandatory to install a 3 bar relief valve and
expansion vessel. No shut-off fittings may be installed
between the relief valve, expansion vessel and boiler.
It is mandatory to install a three-way valve
(Laddomat or similar) or a four-way mixing
valve which to ensure that the temperature
of the heating medium fed into the boiler
from the heating installation is at least
65°С
.
Legend /Diagrams 7 and 8/
Elements
INPUTS
Symbol
Room thermostat
I02
RT
Boiler sensor
I03
B
STB termostat of the burner
I04
RB
Sensor water heater
I05
WH
Sensor exhaust
I06
PT
Temperature sensor at the top of the buffer
I08
AT
Temperature sensor at the bottom of the buffer
I17
NA1
Elements
OUTPUTS
Symbol
Fan smoke gases
О 01
FSG
Ignitor
О 03
IGN
Fan cleaning of the burner
О 04
FC
Screw fuel
О 05
SF
Screw burner
О 06
SB
Pump heating
О 07
PH
Pump water heater
О 08
PHW
Electric motor of self-cleaning system
О 10
CS
Electric motor of
clean ash
О 11
CA
Содержание EN-B
Страница 59: ...59 Diagrams Schemes Sch mas 1 3 2 4 5...
Страница 60: ...60 Diagrams Schemes Sch mas 5 1 6 45o...
Страница 64: ...64 Diagrams Schemes Sch mas 9 10 CHPUMP RT room thermostat TTOP TBOTTOM CHPUMP...
Страница 65: ...65 Diagrams Schemes Sch mas 11 T TOP T BOTTOM CHPUMP DHW sensor CHPUMP DHWPUMP TTOP TBOTTOM 12...
Страница 66: ...66 Diagrams Schemes Sch mas 23 23 1 U H D V W1 Z O F P M W2 D K W F P L J B L A N B...
Страница 67: ...67 Diagrams Schemes Sch mas 24 25 26 27...