2
Installation
Unpacking and Inspecting the Instrument
Thermo Scientific
Surveyor UV/Vis Plus Detector Hardware Manual
11
Unpacking and Inspecting the Instrument
Carefully remove the detector from the shipping container and inspect both the detector and
the packaging for any signs of damage. If you find any damage, save the shipping materials
and immediately contact the shipping company.
Verify that the shipping container contains these items:
• Surveyor UV/Vis Plus Detector
• Accessory kit (P/N 60053-62004)
Detectors ordered with a standard 10 mm flow cell arrive with the flow cell installed in the
detector. Detectors ordered with a 50 mm LightPipe flow cell arrive with the LightPipe flow
cell packaged in the accessory kit.
lists the contents of the accessory kit. Carefully check to make sure you have received
all the items listed on the packing list. If any items are missing, contact your Thermo Fisher
Scientific representative immediately.
Table 2.
Surveyor UV/Vis accessory kit
Description
Quantity
Part number
Cable, Ext. Run/Auto Zero
1
6040-0102
8-pin cable connector, 3.81 mm pitch, minicombicon
2
00004-02511
Cable, RJ45 Ethernet communication, CAT-5, shielded
1
70111-63302
Cable, analog, shielded, detector
2
6040-0103
Nut, 1/16 in., 1/4-28 threads
2
3256-0024
Ferrule, 1/4-28 threads,
material: ethylene tetrafluoroethylene (ETFE)
2
3256-0025
Nut and Ferrule set tube
1
3256-0022
LC Test Mix, 1 mL
1
A3469-020
Funnel, Surveyor
1
F3012-010
Tubing, convoluted, detector drain
1
F5034-010
Screwdriver, Hex, ball end, 3/32 in., black
1
00725-00040
Screwdriver, Hex, ball end, 1/8 in., black
1
00725-00042
Screwdriver, Hex, ball end, 9/64 in., black
1
00725-00044
Содержание Surveyor UV Plus
Страница 1: ...Thermo Surveyor UV Vis Plus Detector Hardware Manual 60053 97108 Revision F December 2013...
Страница 16: ......
Страница 66: ......
Страница 76: ......