2
Installation
Installation Checklist
10
Surveyor UV/Vis Plus Detector Hardware Manual
Thermo Scientific
Installation Checklist
This checklist summarizes the steps required to properly install the UV/Vis detector:
Installation step
Reference page
Unpack and inspect your instrument.
Provide the proper location and environment.
Gather the necessary tools.
Check the power settings and fuses.
Make the back panel connections.
If you ordered the Surveyor UV/Vis Plus Detector with the
LightPipe flow cell option, connect and install the LightPipe
flow cell.
Turn on the UV/Vis detector for the first time.
This UV/Vis detector was installed by:
(Name)
(Date)
Содержание Surveyor UV Plus
Страница 1: ...Thermo Surveyor UV Vis Plus Detector Hardware Manual 60053 97108 Revision F December 2013...
Страница 16: ......
Страница 66: ......
Страница 76: ......