Thermo Fisher Scientific
Prima PRO & Sentinel PRO Mass Spectrometers User Guide
5-1
Chapter 5
Installation &
Interconnection
This section covers the work to be carried out before startup of the
instrument. Before continuing, review
All aspects addressed in
place or provided for before continuing.
Note:
The instrument must be positioned upright and stationary for
at least 24 hours before applying power.
The site should meet the environmental specifications detailed in
The instrument should be positioned to allow service access through
the cabinet door, to the inlet system, and to the air conditioning unit.
Caution!
The instrument should be positioned so as not to obstruct
or impede easy access to the isolation switch. Refer to the relevant
site installation drawings for detailed information.
The instrument is mounted to a frame suitable for floor / wall fixing.
See the appropriate installation drawing for details of fixing points
and recommended clearances.
A grounded, blank, gland plate is supplied in the enclosure base. This
is the only place where drilling the enclosure for user cable entries is
allowed. Wherever possible, the outer screen or armour of cable
entering at this point should be grounded to the enclosure.
Any cable glands compatible with the cable / conduit type being used
are acceptable providing that the enclosure integrity is maintained.
Introduction
Positioning
the Instrument
Cable
Connections
General
Requirements
Safe Area Systems
Содержание Prima PRO
Страница 3: ......
Страница 5: ......
Страница 23: ......
Страница 45: ......
Страница 49: ......
Страница 85: ......
Страница 129: ......
Страница 189: ......
Страница 195: ......
Страница 203: ...Regulatory China RoHS F 4 Prima PRO Sentinel PRO Mass Spectrometers User Guide Thermo Fisher Scientific...