Table of Contents
Section
Section Title — Installation
Page
3.0
Installation
15
3.1
Unpack and Inspect
15
Table 3- Checklist of Components
15
3.2
Site Preparation
15
3.3
Connect the ModulyoD to the Electrical Supply
16
3.4
Connect the Vacuum Pump
16
3.5
Connect a Vacuum Pump to the ModulyoD
16
Figure 9-Connect a VLP195FD or VLP120 Pump to the ModulyoD
17
3.6
Pump Outlet Safety
17
3.7 Test
After
Installation
17-18
Section
Section Title — Operation
Page
4.0
Operation
19
4.1
Safety
19
4.2
Sequence of Operation
19
Table 4-Sequence of Operation
19
4.3
Prepare the ModulyoD
20
4.4.
Fit the Sample Container and Other Accessories
20
4.5
Pre-Cool the ModulyoD
20-21
4.6
Drying
21-22
4.7
Shut Down
22
4.8
Defrost the ModulyoD
23
4.9
Operation With No Load
24
Section
Section Title — Maintenance
Page
5.0
Maintenance
24
5.1
Safety
24
5.2
Precautions
24
5.3
Refrigerant Leaks
25
Section
Section Title — Accessories
Page
6.0
Accessories/Drying Accessories
25
Section
Section Title — Warranty & Appendices
Page
7.0
Warranty and Liability
26
Appendix A - Using the ModulyoD as a Cold Trap
26
Appendix B - Decision Tree
27
Freeze Drying User’s Lo
g
28
3
Содержание ModulyoD
Страница 1: ... NSTRUCTION ANUAL 0 6 0 SFF F SZFS 5HY ...
Страница 29: ......